11. Contingency analysis

Contingency analysis asks what the grid does when something is lost or the demand grows. GridSim answers with nine verbs. Three take branches out of the network one at a time, in pairs, or in sequence with a corrective redispatch, re-solve the power flow after each outage and classify the result (nminus1, nminus2, n-1-1). nminus1-sweep runs the single-branch screen in parallel and at scale. trip and screen lose generators and judge the frequency response against the GB limits, with no power flow. stress scales the load until the power flow stops converging. chain solves a sequence of operating points, each warm-started from the last. cycle runs the N-1 screen continuously inside the real-time analysis cycle. Battery storage in a chain run is specified in ch. 27, Battery energy storage. The desktop app's right-click trip is described in ch. 8, The desktop app.

Before you start

gridsim means the installed command, or dotnet run --project src/GridSim.Cli -c Release -- from a checkout (ch. 1, Getting started). The network a verb runs on differs between verbs, and the difference matters.

Every verb in this chapter takes the network the same way: a positional case or --dir <folder> (ch. 19, Case arguments). The positional case is a built-in name (case9, case14, case30, case57, case118, case300, case145, case24, cigre, uk, gb-full, gb-synthetic), a MATPOWER .m file (a path, a path under data/matpower such as pegase/case1354pegase.m, or a bare file name such as case33bw.m, which is found in the data/matpower subfolders), or a JSON case directory, meaning a folder with a system.json (ch. 2, Loading networks). --dir <folder> names a JSON case directory. Giving both is refused with exit 2 unless they name the same folder, and a --dir folder that does not exist exits 1 with error: <verb>: case folder not found: ....

  • trip, screen, nminus1, nminus2 and n-1-1 default to the reduced GB model (data/uk, 20 buses, 24 branches). trip also takes a generator name: trip <case> <gen>, or trip <gen> on the default model. A single free token is read as a case when it names one, and as a generator name otherwise.
  • nminus1-sweep, stress and chain default to case118. nminus1-sweep and stress also take --all for every registered case; --all with a case or --dir exits 2.
  • cycle defaults to data/uk.

A user network above the installed licence tier's bus limit is refused with exit 2 (ch. 4, Licensing and activation). The bundled networks are never counted: gb-full (3,539 buses), gb-synthetic, uk and the folders under data/matpower, data/intl and data/dist3ph load at every tier.

The Newton-Raphson engines behind these verbs are bit-identical between runs, so a screen run twice gives the same table to the last digit. The worker count changes throughput only: a parallel screen returns the same converged and secure verdict for every outage as a sequential one. Every captured block in this chapter carries the timings and stamps of the run that produced it; they differ by machine and run.

nminus1, nminus2, n-1-1, nminus1-sweep, stress and chain solve with one option set: 100 Newton iterations, generator reactive limits enforced, and the on-load tap changer loop, so every post-outage state is the tap-regulated steady state that gridsim <case> --once reports (ch. 19, Solver selection).

Worked example

Screen every single branch outage on the reduced GB model:

gridsim nminus1

The flags of every verb are in ch. 19, CLI reference.

$ gridsim nminus1
GridSim  -  N-1 branch screening: GB reduced (10-zone)
==========================================================================
Base case: secure (no violation before any outage).
Outage                          Status        MaxLoad  WorstBnd  Vmin   Vmax
--------------------------------------------------------------------------
L1-2 N-S Scotland               ISLANDED      islanded
L2-3 B6 boundary                ISLANDED      islanded
T1 GSP N Scotland (tx)          ISLANDED      islanded
T2 GSP S Scotland (tx)          ISLANDED      islanded
T3 GSP N England (tx)           ISLANDED      islanded
T4 GSP Yorkshire (tx)           ISLANDED      islanded
T5 GSP N Wales & Mersey (tx)    ISLANDED      islanded
T6 GSP Midlands (tx)            ISLANDED      islanded
T7 GSP East Anglia (tx)         ISLANDED      islanded
T8 GSP London & SE (tx)         ISLANDED      islanded
T9 GSP South (tx)               ISLANDED      islanded
T10 GSP SW & S Wales (tx)       ISLANDED      islanded
L3-4 N England-Yorks            secure           85%      68%  0.998  1.040
L3-5 N England-N Wales          secure           85%      68%  0.998  1.040
L4-6 Yorks-Midlands             secure           85%      68%  0.998  1.040
L5-6 N Wales-Midlands           secure           85%      68%  0.998  1.040
L4-7 Yorks-E Anglia             secure           85%      68%  0.998  1.040
L6-7 Midlands-E Anglia          secure           85%      68%  0.998  1.040
L6-8 Midlands-London            secure           85%      68%  0.998  1.040
L7-8 E Anglia-London            secure           85%      68%  0.998  1.040
L6-9 Midlands-South             secure           85%      68%  0.998  1.040
L8-9 London-South               secure           85%      68%  0.998  1.040
L9-10 South-SW                  secure           85%      68%  0.998  1.040
L5-10 N Wales-SW                secure           85%      68%  0.998  1.040
--------------------------------------------------------------------------
24 outages screened  12 secure  0 with violations  12 islanded
Verdict: NOT SECURE, 12 insecure outage(s) (exit 3).
[exit 3]

The model has 24 branches, so 24 outages were screened. The base case, solved first with the same options, has no violation. Twelve outages leave the network connected and inside its limits (secure). Twelve leave a part of the network cut off, and the power flow cannot solve it (ISLANDED): the two north-south lines L1-2 and L2-3 that carry Scotland, and the ten transformers T1 to T10, each the only feed to one grid supply point. The twelve secure rows are the meshed 400 kV lines. Their MaxLoad of 85% and WorstBnd of 68% are the loading of the T6 GSP Midlands transformer (84.53% in the L3-4 row) and the worst boundary loading (67.79%), which none of these ten line outages moves by a whole percent, so the columns repeat from row to row. Vmin 0.998 pu is the voltage after the tap changers have acted, the same as gridsim uk --once reports. The model is not N-1 secure, because twelve outages island, so the verdict says so and the run exits 3.

Reading the output

The report has a header, the base-case line, a table with one row per outage, a footer and the verdict.

Header. GridSim - N-1 branch screening: <model name>, then a line of =.

Base case. The intact network is solved first, with the same options as the outages, and its violations are printed once: Base case: secure (no violation before any outage). or Base case: N pre-existing violation(s), reported once here and not counted against any outage: <list>. A base case that does not converge stops the run with exit 3 and error: <verb>: the base case of <model> did not converge (...).

Outage. The branch name, cut to 29 characters followed by ... when it is longer than 30. A transformer carries the suffix (tx). A branch with no name is shown as <from>-<to> bus numbers. In nminus2 the label joins two branches with +; in n-1-1 it reads first => second.

Status. One of four values.

  • secure: the power flow converged and no limit is violated.
  • base only: the power flow converged and the outage adds no violation of its own, but the state still carries the violations the base case already had. It counts as secure for the outage; the base case itself fails the verdict.
  • VIOLATIONxN: the power flow converged and the outage causes N violations that the base case did not have. A violation is new when its element was not violating in the base case: a branch above 100% of its rating (RateA), a boundary above its transfer limit, or a bus below 0.94 pu or above 1.06 pu. One violation is counted for each new branch, one for each new boundary, one if any bus newly falls below 0.94 pu and one if any newly rises above 1.06 pu. The table prints the count, not the list. Each bus is judged against its own limits where the case gives them (MATPOWER VMIN / VMAX, JSON vminPu / vmaxPu) and against 0.94 / 1.06 pu on any side it leaves unset; --global-vlimits judges every bus against the band instead. Every MATPOWER file carries VMIN and VMAX, so the choice changes verdicts on the bundled MATPOWER cases; see ch. 19.
  • ISLANDED: no converged state, and the outage split the network (the post-outage network has more connected parts than the case). The row prints the reason in place of the numbers: islanded, or solver error: <type>: <message> when the solver threw. The screens elect no slack bus for a separated part, so a part cut off from the slack bus has no solution, whether or not it holds generation; a part that provably cannot solve is reported without running the solver on it.
  • NO SOLUTION: no converged state on a network that is still connected (a voltage collapse, for example case14 branch 1-2 with reactive limits on); the reason reads no solution. The count line adds N not solved.

MaxLoad. The highest branch loading in the post-outage state, in whole percent of RateA: the larger of the two end flows over the rating. A branch with no rating loads 0%, so a case whose branches carry no ratings never shows a thermal violation. case14, case57, case118 and case300 carry no ratings; case9, case30, case24 and cigre rate every branch, and case145 rates 58 of its 453.

WorstBnd. The highest boundary loading, in whole percent of the boundary's transfer limit. A boundary with limit 0 has no limit authored: its flow is not reported as loading and it is never over limit. A case with no boundaries shows 0%.

Vmin, Vmax. The lowest and highest bus voltage magnitude in pu, to three decimals.

Footer. N outages screened S secure V with violations I islanded, with M not solved added when there are any, then, when some secure rows are base only, a line counting them.

Order. nminus1 lists islanded outages first, then converged outages by violation count, largest first; ties keep model order. nminus2 and n-1-1 list worst first by stress score (see nminus2).

Verdict and exit code. The last line is the verdict, and the exit code carries it: Verdict: SECURE (exit 0). when the base case and every outage are secure, Verdict: NOT SECURE, ... (exit 3). when the base case has a violation or any outage violates, islands or does not solve. A script can read the exit code.

A network that is already outside the voltage band before any outage reports that violation once, in the base-case line, and not on every outage. The all-island Irish model is an example:

gridsim nminus1 --dir data/intl/ireland-all-island
$ gridsim nminus1 --dir data/intl/ireland-all-island
GridSim  -  N-1 branch screening: Ireland all-island (EirGrid + SONI) - open transmission model
==========================================================================
Base case: 1 pre-existing violation(s), reported once here and not counted against any outage: overvoltage 1.126 p.u.
Outage                          Status        MaxLoad  WorstBnd  Vmin   Vmax
--------------------------------------------------------------------------
L3105 6062-6067                 ISLANDED      islanded
L1437 6063-6077                 ISLANDED      islanded
L14631 6069-6083                ISLANDED      islanded
TX16082 7033-7034 (tx)          ISLANDED      islanded
L10420 6067-6068                VIOLATIONx1      23%       0%  1.020  1.159
L10419 6068-6069                VIOLATIONx1      24%       0%  1.020  1.161
L10404 6075-6076                VIOLATIONx1      30%       0%  1.019  1.167
L13030 6071-7197                VIOLATIONx1      26%       0%  1.020  1.200
...
TX15942 6079-6080 (tx)          base only        22%       0%  1.020  1.125
TX15943 6085-6086 (tx)          base only        23%       0%  1.020  1.173
TX15944 6090-6091 (tx)          base only        23%       0%  1.020  1.174
--------------------------------------------------------------------------
82 outages screened  70 secure  8 with violations  4 islanded
(68 of the secure outages are 'base only': they add no violation, but the base case's own violations remain in their state)
Verdict: NOT SECURE, 1 base-case violation(s) and 12 insecure outage(s) (exit 3).
[exit 3]

The base case already reaches 1.126 pu (gridsim --dir data/intl/ireland-all-island --once reports Voltage range: 1.020 - 1.126 p.u. (OUT OF BAND)), and that is printed once. Four outages island. Eight push a bus that was inside the band above 1.06 pu, so they violate. Seventy are secure for the outage; 68 of them are base only, because the buses that were already high stay high. base only does not say how far an already-high bus moves: TX15943 takes the highest voltage from 1.126 to 1.173 pu and is still base only, so read Vmax on those rows.

Variations

nminus2 - two branches lost together

gridsim nminus2 [--dir <folder>] [--candidates N] [--exhaustive] [--top N]

n-2 is an alias; the flags are in ch. 19.

A full pairwise sweep is C(n,2) solves. On the reduced GB model that is 276 solves. gb-full has 5,918 branches, which makes 17,508,403 pairs, so nminus2 screens N-1 first, ranks the single outages that solve by how hard they stress the system, keeps the --candidates most stressed, and solves only the unordered pairs among them. The score is the branch loading plus the boundary loading plus a penalty for any voltage outside 0.94 to 1.06 pu. A single outage that islands or does not solve is not ranked: it already fails at N-1, so it is left out of the pairing and listed under the table. --candidates is held between 2 and the number of single outages that solve. --exhaustive solves every pair and ignores --candidates. --top limits the rows printed; every pair is still screened and counted. The base case, the netting, the statuses and the verdict are as for nminus1; the outages left out of the pairing also count against the verdict.

$ gridsim nminus2 --exhaustive --top 216
GridSim  -  N-2 branch screening: GB reduced (10-zone)  [exhaustive (every pair)]
==========================================================================
Base case: secure (no violation before any outage).
Outage                          Status        MaxLoad  WorstBnd  Vmin   Vmax
--------------------------------------------------------------------------
L1-2 N-S Scotland + L2-3 B6 b...  ISLANDED      islanded
...
T7 GSP East Anglia (tx) + T10...  ISLANDED      islanded
T8 GSP London & SE (tx) + T9 ...  ISLANDED      islanded
T8 GSP London & SE (tx) + T10...  ISLANDED      islanded
T9 GSP South (tx) + T10 GSP S...  ISLANDED      islanded
L7-8 E Anglia-London + L8-9 L...  VIOLATIONx1     112%      68%  0.998  1.040
L6-8 Midlands-London + L8-9 L...  VIOLATIONx1     112%      68%  0.998  1.040
L6-8 Midlands-London + L7-8 E...  VIOLATIONx1     111%      68%  0.998  1.040
L3-4 N England-Yorks + L5-6 N...  secure           87%      68%  0.998  1.040
--------------------------------------------------------------------------
(showing worst 216 of 276)
276 outages screened  61 secure  3 with violations  212 islanded
Verdict: NOT SECURE, 215 insecure outage(s) (exit 3).
[exit 3]

Of the 276 pairs, 212 island and 64 converge. Three converged pairs violate (the loss of two of the London lines overloads the third at 112%) and 61 are secure. The table is the same as for nminus1, worst first, with the pair named by both branches and (showing worst N of M) above the footer when --top cut the list.

On a network with radial branches the single outages that island are kept out of the candidate set, so every pair is made of outages that solve on their own. The Irish model has four islanding outages among 82 branches; with --candidates 6 the six candidates are the six most-stressed outages that solve, and the four islanding ones are listed under the table:

gridsim nminus2 --dir data/intl/ireland-all-island --candidates 6
$ gridsim nminus2 --dir data/intl/ireland-all-island --candidates 6
GridSim  -  N-2 branch screening: Ireland all-island (EirGrid + SONI) - open transmission model  [top-6 candidate pairs]
==========================================================================
Base case: 1 pre-existing violation(s), reported once here and not counted against any outage: overvoltage 1.126 p.u.
Screening N-1 first, then pairing the 6 most-stressed single outages that solve.
Outage                          Status        MaxLoad  WorstBnd  Vmin   Vmax
--------------------------------------------------------------------------
L13030 6071-7197 + L3100 6076...  ISLANDED      islanded
L13030 6071-7197 + L10404 607...  ISLANDED      islanded
L3100 6076-8427 + L10404 6075...  ISLANDED      islanded
L10418 6069-8427 + L13479 608...  VIOLATIONx1      46%       0%  1.020  1.324
L13030 6071-7197 + L13479 608...  VIOLATIONx1      45%       0%  1.020  1.313
L10418 6069-8427 + TX15944 60...  VIOLATIONx1      30%       0%  1.020  1.269
L13479 6083-7691 + L3100 6076...  VIOLATIONx1      40%       0%  1.018  1.256
L13479 6083-7691 + L10404 607...  VIOLATIONx1      40%       0%  1.019  1.253
L13030 6071-7197 + TX15944 60...  VIOLATIONx1      27%       0%  1.020  1.259
L13479 6083-7691 + TX15944 60...  base only        35%       0%  1.020  1.238
L10418 6069-8427 + L3100 6076...  VIOLATIONx1      36%       0%  1.018  1.225
L10418 6069-8427 + L10404 607...  VIOLATIONx1      35%       0%  1.019  1.223
L3100 6076-8427 + TX15944 609...  VIOLATIONx1      33%       0%  1.018  1.223
TX15944 6090-6091 (tx) + L104...  VIOLATIONx1      33%       0%  1.019  1.220
L10418 6069-8427 + L13030 607...  VIOLATIONx1      21%       0%  0.838  1.020
--------------------------------------------------------------------------
15 outages screened  1 secure  11 with violations  3 islanded
(1 of the secure outages are 'base only': they add no violation, but the base case's own violations remain in their state)
4 single outage(s) left out of the pairing because they already fail at N-1 (islanded or no solution):
  L3105 6062-6067                 islanded
  L1437 6063-6077                 islanded
  L14631 6069-6083                islanded
  TX16082 7033-7034 (tx)          islanded
Verdict: NOT SECURE, 1 base-case violation(s) and 18 insecure outage(s) (exit 3).
[exit 3]

All fifteen pairs are new information: three island together although each member solves alone, eleven violate and one adds nothing to the base case's overvoltage. The verdict counts the 14 insecure pairs and the 4 outages left out of the pairing.

n-1-1 - lose, redispatch, lose again

gridsim n-1-1 [--dir <folder>] [--candidates N] [--exhaustive] [--top N]

nminus1minus1 is an alias; the flags are in ch. 19.

N-1-1 is not N-2. In an N-2 both branches are lost in one event and the order does not matter. In an N-1-1 the first branch trips, the operator redispatches generation, and then the second trips, so the pairs are ordered: A => B and B => A are different scenarios and both are screened. The candidate set is chosen as for nminus2, and every ordered pair of distinct candidates is solved: c(c-1) solves for c candidates.

The corrective action is what an operator does after the first loss. It acts only when the first outage leaves a rated line or a limited boundary over its limit in the DC model of the network; with nothing over its limit the dispatch is unchanged and the pair is exactly the N-2 pair. When something is over its limit it moves the fewest MW of generation (raises some units, lowers others, within each unit's limits) that bring every rated line and every limited boundary back inside its limit, and it keeps each DC island's total generation, so a first outage that splits the network is redispatched island by island. When no such redispatch exists the dispatch is left as it was and the second outage is screened on the unchanged operating point. The redispatch is computed once per first outage and reused for every second. When several redispatches move the same fewest MW, a fixed tie-break picks one (the simplex takes the lowest-index entering column among those whose reduced costs agree within 1e-10 relative), so the plan does not depend on the order of floating-point sums; on case145, pglib case73 and case30_as it chooses between whole-unit moves of equal total.

gridsim n-1-1 --exhaustive --top 430
$ gridsim n-1-1 --exhaustive --top 430
GridSim  -  N-1-1 sequential screening: GB reduced (10-zone)  [exhaustive (every ordered pair)]
==========================================================================
Base case: secure (no violation before any outage).
Lose one element; if a line or boundary is then over its limit, redispatch the fewest MW that relieve it
(DC model, island by island); then lose a second.
Outage (first => second)        Status        MaxLoad  WorstBnd  Vmin   Vmax
--------------------------------------------------------------------------
L1-2 N-S Scotland => L2-3 B6 ...  ISLANDED      islanded
L1-2 N-S Scotland => L3-4 N E...  ISLANDED      islanded
...
T10 GSP SW & S Wales (tx) => ...  ISLANDED      islanded
T10 GSP SW & S Wales (tx) => ...  ISLANDED      islanded
T10 GSP SW & S Wales (tx) => ...  ISLANDED      islanded
L7-8 E Anglia-London => L8-9 ...  VIOLATIONx1     112%      68%  0.998  1.040
L8-9 London-South => L7-8 E A...  VIOLATIONx1     112%      68%  0.998  1.040
L6-8 Midlands-London => L8-9 ...  VIOLATIONx1     112%      68%  0.998  1.040
L8-9 London-South => L6-8 Mid...  VIOLATIONx1     112%      68%  0.998  1.040
L6-8 Midlands-London => L7-8 ...  VIOLATIONx1     111%      68%  0.998  1.040
L7-8 E Anglia-London => L6-8 ...  VIOLATIONx1     111%      68%  0.998  1.040
--------------------------------------------------------------------------
(showing worst 430 of 552)
552 outages screened  122 secure  6 with violations  424 islanded
Verdict: NOT SECURE, 430 insecure outage(s) (exit 3).
[exit 3]

All 424 islanded pairs come first (212 pairs, each in both orders). No meshed first outage leaves anything over its limit, so no redispatch is made and each converged pair is the N-2 pair in both orders: 122 secure and 6 violating (the three London pairs of the N-2 table, each in both orders).

trip - lose one generator

gridsim trip [<case>] [<gen>] [--dir <folder>] [--export <csv>]

The flags are in ch. 19. trip removes one generator's output and its stored rotational energy, integrates the centre-of-inertia swing equation, and reports the frequency response. It runs no power flow.

$ gridsim trip
GridSim  -  contingency on GB reduced (10-zone)
================================================================
Tripped:        Hinkley Point Nuclear  (2880 MW lost, nuclear)
System inertia: 171.7 -> 158.9 GVAs after the trip
Peak RoCoF:     -0.453 Hz/s  (largest |df/dt| over the run)
Nadir:          48.340 Hz  (t+6.9 s)
Settling:       49.144 Hz

50.05 Hz |***+==-:,,..           ....,,,::::-----=========------------::::| 48.34 Hz (nadir)

...at HALF the inertia (79.5 GVAs): RoCoF -0.906 Hz/s, nadir 47.879 Hz
[exit 0]
  • Tripped is the unit and the MW it was producing (Pg), with its fuel type.
  • System inertia is the rotating mass's stored energy, the sum of H x MBase over the synchronous machines (a converter-type unit adds nothing whatever its H), in GVAs, before and after the unit leaves.
  • Peak RoCoF is the largest rate of change of frequency in the trace, in Hz/s. It is negative for a loss of generation. For a single trip without --forming or --asset-dynamics it is the slope just after the trip.
  • Nadir is the lowest frequency, with the time after the trip at which it occurs.
  • Settling is the frequency at the end of the 30 s window. It is not a steady-state value: the governors are still recovering at 30 s.
  • The line of characters is a trace of up to 64 columns, labelled with 50.05 Hz (the top of the scale) and its nadir, drawn on a nine-level ramp " .,:-=+*#".
  • The half-inertia line repeats the trip at half the remaining inertia, always on the lumped model, to show how much of the response is inertia.
  • After it, trip assesses the system frequency protection on the run's trajectory: 81U against the minimum, 81O against the maximum and 81R against the peak |df/dt|, at the protection-check defaults (47.5 Hz, 52.0 Hz, 1.0 Hz/s). Each line says holds, WOULD OPERATE or not evaluated; 78 (vector shift) is not evaluated, and on a case that is not 50 Hz neither are 81U and 81O. The lines are information and do not change the exit code.

<gen> must come directly after trip. It is a case-insensitive substring of a generator name, and the first generator whose name contains it is tripped. With no name, trip takes the unit with the highest dispatch among units that are not on the slack bus and have an inertia constant above zero. A name directly after trip that matches nothing exits 2 and lists the first 20 names; it never falls back to another unit:

$ gridsim trip nosuchunit
error: trip 'nosuchunit' matched no generator in GB reduced (10-zone). Available: North Scotland Hydro, North Scotland Onshore Wind, Torness Nuclear, South Scotland Onshore Wind, Moyle, Heysham Nuclear, North England CCGT, North Sea Link, Drax Biomass, Yorkshire CCGT, Mersey Offshore Wind, North Wales CCGT, EWIC, Midlands CCGT (marginal), East Anglia Offshore Wind, Sizewell B Nuclear, Viking Link, IFA, ElecLink, NemoLink
[exit 2]

A case with no eligible unit also exits 2. --export <csv> writes the trajectory as dtm,f rows, which gridsim replay <csv> plays back. trip is the one verb that integrates the distributed multi-domain inertia model (--inertia-model distributed); it also honours --asset-dynamics and --forming (see Global switches). The run is at the case's own nominal frequency, so the 60 Hz case9 starts at 60 Hz. --gb-services[=<scale>] adds the GB Dynamic Containment, Moderation and Regulation layer at the typical volumes, --band[=<fraction>] adds the nadir's band over the unfitted swing constants, --envelope (with --asset-dynamics) sweeps asset-class control parameters around the trip, and --dyn-data <file> takes the machines' inertia from a dynamic data file; all are in ch. 19, trip and ch. 14.

On another network:

gridsim trip --dir data/intl/ireland-all-island
$ gridsim trip --dir data/intl/ireland-all-island
GridSim  -  contingency on Ireland all-island (EirGrid + SONI) - open transmission model
================================================================
Tripped:        Aghada  (336 MW lost, gas)
System inertia: 27.7 -> 23.4 GVAs after the trip
Peak RoCoF:     -0.358 Hz/s  (largest |df/dt| over the run)
Nadir:          47.641 Hz  (t+12.5 s)
Settling:       48.534 Hz

50.05 Hz |****++==--::,,,....                       .........,,,,,,,,,,,,,| 47.64 Hz (nadir)

...at HALF the inertia (11.7 GVAs): RoCoF -0.717 Hz/s, nadir 46.998 Hz
[exit 0]

screen - rank every credible loss against the frequency limits

gridsim screen [--dir <folder>] [--top N] [--csv <path>]

The flags are in ch. 19. screen runs the trip calculation for every generator with a positive dispatch and ranks the losses by the size of the initial RoCoF, largest first. It runs no power flow. The inertia is the rotating-mass total, as for trip, and a case with no rotating machine carrying H above 0 is refused with exit 1 (the RoCoF of a loss would be the artefact of a 1 MWs floor). The screen runs at the case's own nominal frequency; on a case that is not 50 Hz a note: line says so and the statutory and LFDD bands are taken about that nominal.

$ gridsim screen --top 6
GridSim  -  N-1 RoCoF screening: GB reduced (10-zone)
==========================================================================
System inertia 171.7 GVAs  demand 39.50 GW  limits: RoCoF 0.125 Hz/s, statutory 49.5 Hz
--------------------------------------------------------------------------
Lost infeed                       MW   Inertia(rem)   RoCoF   Nadir   Verdict
--------------------------------------------------------------------------
Midlands CCGT (marginal)         5625    126.7 GVAs  -1.110   46.49  LFDD RISK
East Anglia Offshore Wind        4000    171.7 GVAs  -0.582   47.76  LFDD RISK
Hinkley Point Nuclear            2880    158.9 GVAs  -0.453   48.34  LFDD RISK
Yorkshire CCGT                   2400    151.7 GVAs  -0.396   48.59  LFDD RISK
Heysham Nuclear                  2160    162.1 GVAs  -0.333   48.76  LFDD RISK
South Scotland Onshore Wind      2000    171.7 GVAs  -0.291   48.88  <49.5 Hz
--------------------------------------------------------------------------
28 credible single losses screened  19 breach a limit  worst RoCoF -1.110 Hz/s (Midlands CCGT (marginal))
binding case needs >= 1125.0 GVAs spinning for 0.125 Hz/s (has 126.7, headroom -998.3 GVAs)
Verdict: NOT SECURE, 19 of 28 single loss(es) breach a limit (exit 3).
[exit 3]
  • Lost infeed and MW are the generator and its dispatch.
  • Inertia(rem) is the fleet inertia without that unit, in GVAs.
  • RoCoF and Nadir are as for trip.
  • Verdict is the first that applies: LFDD RISK when the nadir is at or below 48.8 Hz, the first stage of low frequency demand disconnection; <49.5 Hz when the nadir is below the statutory floor; >0.125 Hz/s when the RoCoF magnitude exceeds 0.125 Hz/s; otherwise ok.
  • The footer gives the number of losses screened, how many breach a limit, and the worst RoCoF. The last line is the spinning inertia the binding case would need to hold 0.125 Hz/s, and the headroom against what the system has. A negative headroom means the case cannot hold it.
  • The verdict line carries the exit code: exit 3 when any loss breaches a limit, exit 0 (Verdict: SECURE) when every loss is ok.

The header prints the system inertia, the demand and the limits. Every loss is screened and counted whatever --top shows. --csv writes every loss with the columns name,lost_mw,remaining_inertia_gva_s,peak_rocof_hz_per_s,nadir_hz,rocof_breach,statutory_breach,lfdd_risk (the RoCoF column is the peak over the run). The RoCoF limit in the verdict and the CSV is the legacy 0.125 Hz/s relay setting; the technical chapter gives the modern 1.0 Hz/s setting alongside it.

Generator and busbar outages, post-fault ratings and the batched sweep

nminus1 takes four more choices; each is in ch. 19.

gridsim nminus1 uk --outage-types branch,gen,bus
gridsim nminus1 uk --outage-types gen --outage-dispatch droop
gridsim nminus1 case9 --post-fault-rating B
gridsim nminus1 case118 --batched-lanes 0
  • --outage-types adds each in-service generating unit (gen) and each bus with every branch, unit and load on it (bus) to the branch outages. The load and generation each outage takes are printed under its row and are reported, not judged. When an outage takes the reference bus or its last unit, the reference moves to the largest remaining unit in the same connected part, and the row says so.
  • --outage-dispatch decides who picks up the power a gen or bus outage takes away: reference (the default, the reference bus takes it all), droop (the remaining synchronous units in proportion to their MBase) or inertia (in proportion to H x MBase), each unit within its limits.
  • --post-fault-rating B or C judges every outage state against each branch's short-term or emergency rating (rating A where a branch has none); the base case stays on rating A.
  • --batched-lanes N solves the branch outages with the batched contingency sweep on N lanes (0 for one per processor). Every number is bit-identical to the default screen; only the speed differs, and a note: line on standard error says the batched sweep ran.

nminus1-sweep - the branch sweep, in parallel

gridsim nminus1-sweep <case|--all> [--parallel N] [--sample N] [--losses] [--global-vlimits] [--out <path>]

The flags are in ch. 19. The sweep screens every branch of the named case (or of every registered case with --all) on a pool of worker threads and prints one row per case instead of one row per outage. Use nminus1 for the per-outage detail and the sweep for coverage and throughput.

$ gridsim nminus1-sweep case14 --parallel 2
    GridSim  -  <date> UTC
    ...
    run:     nminus1-sweep  cases=1  parallel=2  sample=full  vlimits=per-bus

| Case | Buses | Branches | Screened | Secure | Violations | Islanded | Not solved | Solves/s | Wall s | Base viol |
|------|------:|---------:|---------:|-------:|-----------:|---------:|-----------:|---------:|-------:|----------:|
| case14 | 14 | 20 | 20 | 16 | 3 | 0 | 1 | 526 | 0.0 | 1 |
[n-1] case14: 14 buses, screening 20 outages on 2 threads...
[n-1] done -> results\nminus1-sweep.md
[n-1] verdict: 1 of 1 case(s) not N-1 secure (exit 3).
[exit 3]

The columns are the case, bus and branch counts, outages screened, and the secure, violating, islanded and Not solved counts (Islanded counts only the outages that split the network, Not solved the connected outages with no solution), then the throughput in solves per second, the wall time in seconds, and Base viol, the number of violations the base case already has. Those are netted out of every outage as in nminus1, so case14's base overvoltage (bus 8 held at its 1.090 pu set-point) is counted once, in Base viol, and not on every outage; the counts are those of nminus1 case14. The run exits 3 because case14 is not N-1 secure (a base-case violation, 3 violating outages and 1 that does not solve); it exits 0 only when every case is secure. --parallel sets the worker threads (0 means every logical core).

--sample N screens N evenly spaced branches of a large case. The row is marked (sampled) and a line on stderr says so; a sample is never silent:

$ gridsim nminus1-sweep case118 --sample 20 --parallel 2
...
| Case | Buses | Branches | Screened | Secure | Violations | Islanded | Not solved | Solves/s | Wall s | Base viol |
|------|------:|---------:|---------:|-------:|-----------:|---------:|-----------:|---------:|-------:|----------:|
| case118 (sampled) | 118 | 186 | 20 | 18 | 1 | 1 | 0 | 211 | 0.1 | 0 |
[n-1] case118: SAMPLING 20/186 branches (--sample 20)
[n-1] case118: 118 buses, screening 20 outages on 2 threads...
[n-1] done -> results\nminus1-sweep.md
[n-1] verdict: 1 of 1 case(s) not N-1 secure (exit 3).
[exit 3]

case118 carries no branch ratings, so only voltage violations can appear in its sweep.

--losses adds the loss-contingency sweep after each case: the change in total system losses for each outage, with the 20 outages that raise losses most:

$ gridsim nminus1-sweep case118 --losses --parallel 4
...
| Case | Buses | Branches | Screened | Secure | Violations | Islanded | Not solved | Solves/s | Wall s | Base viol |
|------|------:|---------:|---------:|-------:|-----------:|---------:|-----------:|---------:|-------:|----------:|
| case118 | 118 | 186 | 186 | 164 | 13 | 9 | 0 | 799 | 0.2 | 0 |

### Loss contingency - case118 (base losses: 132.48 MW)
| Outage | Delta MW | Post MW | Loading % |
|--------|--------:|--------:|----------:|
| 8-5 (tx) | +66.66 | 199.14 | 0.0 |
| 38-37 (tx) | +36.91 | 169.39 | 0.0 |
| 38-65 | +35.00 | 167.48 | 0.0 |
| 26-30 | +33.10 | 165.58 | 0.0 |
| 30-17 (tx) | +17.11 | 149.59 | 0.0 |
| 64-65 | +14.59 | 147.07 | 0.0 |
| 89-92 | +14.02 | 146.50 | 0.0 |
...
| 88-89 | +4.58 | 137.06 | 0.0 |
| 42-49 | +4.44 | 136.92 | 0.0 |
| 42-49 | +4.44 | 136.92 | 0.0 |
| (9 non-converged) | | | |

[n-1] case118: 118 buses, screening 186 outages on 4 threads...
[n-1] case118: running loss contingency sweep...
[n-1] done -> results\nminus1-sweep.md
[n-1] verdict: 1 of 1 case(s) not N-1 secure (exit 3).
[exit 3]

The Loading % column reads 0.0 because case118 has no ratings. The 42-49 branch appears twice because two parallel branches carry the same name. The base and outage solves of the loss sweep use the same options as the screen, with reactive limits on.

The engine follows the shared dense / sparse rule (ch. 19, Solver selection). On the CPU the two engines give the same bits, so only the speed differs. A large case is screened one sample at a time:

$ gridsim nminus1-sweep gb-synthetic --sample 24 --parallel 4
...
| Case | Buses | Branches | Screened | Secure | Violations | Islanded | Not solved | Solves/s | Wall s | Base viol |
|------|------:|---------:|---------:|-------:|-----------:|---------:|-----------:|---------:|-------:|----------:|
| gb-synthetic (sampled) | 2227 | 2268 | 24 | 0 | 0 | 24 | 0 | 5 | 4.9 | 27 |
[n-1] gb-synthetic: SAMPLING 24/2268 branches (--sample 24)
[n-1] gb-synthetic: 2227 buses, screening 24 outages on 4 threads...
[n-1] done -> results\nminus1-sweep.md
[n-1] verdict: 1 of 1 case(s) not N-1 secure (exit 3).
[exit 3]

The rows go to results/nminus1-sweep.md under the current directory, with a .csv sibling and nminus1-sweep.run-metadata.json beside them (the metadata is named after the report); --out moves them. The CSV ends in a base_violations column. A case whose base case does not converge gets a BASE FAIL row and counts as not secure. A case that fails to load is reported as a LOAD FAIL row and the others run; the verb exits 1 if none loaded, and also exits 1 after a partial failure (an input error outranks the security verdict). The sweep, stress and chain honour --gpu; nminus1, nminus2, n-1-1 and cycle run on the CPU.

stress - load to collapse

gridsim stress <case|--all> [--from F] [--to F] [--step F] [--parallel N] [--out <path>]

The flags are in ch. 19. stress scales the case to each load factor from --from to --to, solves every factor independently, and reports the highest factor that converged before the first failure. At each factor every bus load is multiplied by the factor, and so is every generator except the slack unit, which carries the balance.

$ gridsim stress case14
    GridSim  -  2026-10-19 17:39:26 UTC
    code:    git v1.95.294-168-g786a2162  |  GridSim.Core v1.95.462.0  |  build Release
    runtime: .NET 10.0.12  X64  GC=Server
    machine: LAPTOP  Microsoft Windows 10.0.26300
    cpu:     Intel(R) Core(TM) i3-N305  -  8 logical cores  -  8 GB RAM
    simd:    Avx256  (4 doubles/step)  FMA=True
    backend: cpu
    run:     stress  cases=1  load 0.5->2 step 0.05  parallel=8

| Case | Buses | Max loadability (x base) | Vmin at collapse | Notes |
|------|------:|-------------------------:|-----------------:|-------|
| case14 | 14 | 1.75 | 0.714 |  |
[stress] case14: 31 load points on 8 threads...
[stress] done -> results\stress.md
[exit 0]

Max loadability is the highest converged factor before the first that failed, as a multiple of the base load. Vmin at collapse is the lowest bus voltage at that last converged factor; it is not the voltage at the failing point. The sweep resolution is --step: with 0.05 the answer for case14 is 1.75, and a finer sweep finds the real limit between 1.75 and 1.80:

$ gridsim stress case14 --from 1.7 --to 1.8 --step 0.01
...
| Case | Buses | Max loadability (x base) | Vmin at collapse | Notes |
|------|------:|-------------------------:|-----------------:|-------|
| case14 | 14 | 1.77 | 0.669 |  |
[stress] case14: 11 load points on 8 threads...
[stress] done -> results\stress.md
[exit 0]

A case that converges at every factor is noted did not collapse in range; widen --to:

$ gridsim stress case118
...
| Case | Buses | Max loadability (x base) | Vmin at collapse | Notes |
|------|------:|-------------------------:|-----------------:|-------|
| case118 | 118 | 2.00 | 0.797 | did not collapse in range |
[stress] case118: 31 load points on 8 threads...
[stress] done -> results\stress.md
[exit 0]

Generator reactive limits are enforced and the tap-changer loop runs at every load point (the contingency option set, see Before you start), so the collapse found is reactive exhaustion where it occurs. A factor counts as collapsed when Newton-Raphson fails to converge within 100 iterations, which is the solver giving up, not a proof that no solution exists. --step must be positive; 0 exits 2:

$ gridsim stress case14 --step 0
error: stress --step must be positive (got 0); the load sweep would never terminate.
[exit 2]

chain - consecutive warm-started solves

gridsim chain <case> [--steps N] [--mode fixed|ramp|daily] [--ramp-pct P] [--out <path>]

The flags are in ch. 19. chain solves one operating point after another and starts each from the voltages of the previous converged solve. The --mode sets the load factor of each step: fixed keeps 1.000; ramp adds --ramp-pct percent per step (1 + ramp/100 x step); daily follows the 24-hour demand curve at 24 x step / steps hours.

$ gridsim chain case118 --mode ramp --steps 6 --ramp-pct 10
...
| Step | Load x | Warm-start iters | Mismatch | Vmin | Vmax |
|-----:|-------:|-----------------:|---------:|-----:|-----:|
| 0 | 1.000 | 6 | 2.85E-014 | 0.943 | 1.050 |
| 1 | 1.100 | 6 | 5.70E-014 | 0.943 | 1.050 |
| 2 | 1.200 | 6 | 1.14E-013 | 0.941 | 1.050 |
| 3 | 1.300 | 8 | 1.05E-009 | 0.933 | 1.050 |
| 4 | 1.400 | 10 | 2.66E-010 | 0.919 | 1.050 |
| 5 | 1.500 | 9 | 5.70E-014 | 0.904 | 1.050 |

Cold (flat-start) iters: 8.  Max warm-start iters over 5 warm-started step(s) (steps 1-5; step 0 starts from the case): 10.  
[chain] done -> results\chain-case118.md
[exit 0]
  • Load x is the load factor of the step.
  • Warm-start iters is the Newton iteration count, summed over the reactive-limit passes. Step 0 starts from the voltages stored in the case, not from a previous solve, so it is not warm.
  • Mismatch is the largest power mismatch at the end of the solve, in pu.
  • Vmin, Vmax are the extreme bus voltages of the step.
  • The last line gives the cold (flat-start) iteration count for comparison and the largest iteration count over the warm-started steps (1 onwards; step 0 is left out). In fixed mode it adds Warm start converges in <=1 iter with no drift - as expected. when that maximum is 1 or below.

In fixed mode every step after the first re-solves the same point. A case that switches no generator to its reactive limit converges in 0 iterations, because the convergence test runs before the first linear solve:

$ gridsim chain case30 --steps 5
...
| Step | Load x | Warm-start iters | Mismatch | Vmin | Vmax |
|-----:|-------:|-----------------:|---------:|-----:|-----:|
| 0 | 1.000 | 3 | 9.57E-010 | 0.961 | 1.000 |
| 1 | 1.000 | 0 | 9.57E-010 | 0.961 | 1.000 |
| 2 | 1.000 | 0 | 9.57E-010 | 0.961 | 1.000 |
| 3 | 1.000 | 0 | 9.57E-010 | 0.961 | 1.000 |
| 4 | 1.000 | 0 | 9.57E-010 | 0.961 | 1.000 |

Cold (flat-start) iters: 3.  Max warm-start iters over 4 warm-started step(s) (steps 1-4; step 0 starts from the case): 0.  Warm start converges in <=1 iter with no drift - as expected.
[chain] done -> results\chain-case30.md
[exit 0]

A case whose generators hit reactive limits, such as case118 or case300, needs 4 or 5 iterations per step even in fixed mode, because a generator bus always restarts at its set-point voltage and the limit switching is found again on each solve. A step that does not converge shows NaN voltages, makes the run exit 3, and does not seed the next step. The iteration count of a failed step can exceed the cap of 100 because it sums the reactive-limit passes:

$ gridsim chain case14 --mode ramp --steps 12 --ramp-pct 20
...
| Step | Load x | Warm-start iters | Mismatch | Vmin | Vmax |
|-----:|-------:|-----------------:|---------:|-----:|-----:|
| 0 | 1.000 | 2 | 1.32E-010 | 1.010 | 1.090 |
| 1 | 1.200 | 8 | 6.47E-012 | 1.006 | 1.090 |
| 2 | 1.400 | 6 | 2.48E-009 | 0.954 | 1.060 |
| 3 | 1.600 | 7 | 9.25E-011 | 0.854 | 1.060 |
| 4 | 1.800 | 104 | 3.39E-002 | NaN | NaN |
| 5 | 2.000 | 104 | 4.16E-001 | NaN | NaN |
| 6 | 2.200 | 104 | 6.49E-001 | NaN | NaN |
| 7 | 2.400 | 104 | 7.41E-001 | NaN | NaN |
| 8 | 2.600 | 104 | 9.63E-001 | NaN | NaN |
| 9 | 2.800 | 104 | 1.30E+000 | NaN | NaN |
| 10 | 3.000 | 104 | 1.49E+000 | NaN | NaN |
| 11 | 3.200 | 105 | 1.68E+000 | NaN | NaN |

Cold (flat-start) iters: 4.  Max warm-start iters over 11 warm-started step(s) (steps 1-11; step 0 starts from the case): 105.  
[chain] done -> results\chain-case14.md
[exit 3]

An unknown --mode exits 2, and a case that does not load exits 1:

$ gridsim chain case14 --mode bogus
error: --mode expected 'fixed', 'ramp' or 'daily' but got 'bogus'
[exit 2]

The report goes to results/chain-<case>.md, with a .csv sibling and chain-<case>.run-metadata.json. Adding --bess sites turns chain into a battery storage time series; that study is specified in ch. 27, Battery energy storage.

cycle - the continuous N-1 and analysis cycle

gridsim cycle <case|--dir <folder>> [--cycles N] [--window-ms MS] [--workers N] [--shards N] [--hold-steady]

The flags are in ch. 19. cycle is the real-time analysis engine in a loop. Each cycle does one single-threaded base solve of the live simulator, then fans every analysis out across a worker pool against that solved state. Work comes in two tiers. The High tier runs to completion every cycle: the operator watch list, N-1 on the hot branches (those loaded at or above --hot-loading, default 80% of rating), and the harmonic penetration study. The Low tier is best effort: the rest of the branches in --shards rotating N-1 shards, the RoCoF screen and the physics audit. --jobs selects which analyses run (n-1, harmonics, rocof, physics, watch).

$ gridsim cycle case118 --cycles 6 --hold-steady
GridSim  -  prioritised parallel analysis cycle: IEEE 118-bus
============================================================================================
case 118 buses / 186 branches   engine Newton-Raphson (dense)
window 1000 ms   workers 7   budget 7.0 core-s/cycle   jobs 13 (3 High / 10 Low)
--------------------------------------------------------------------------------------------
cycle |  base ms | wall ms |  HP   | LP done/adm/def | util% | backlog | note
--------------------------------------------------------------------------------------------
    0 |     76.6 |     252 |  3/3  |  10/10 /0     |   16% |       0 | n-1 shards 8/8
    1 |     18.4 |     141 |  3/3  |  10/10 /0     |   11% |       0 | n-1 shards 8/8
    2 |     17.7 |     199 |  3/3  |  10/10 /0     |   13% |       0 | n-1 shards 8/8
    3 |     22.0 |     185 |  3/3  |  10/10 /0     |   13% |       0 | n-1 shards 8/8
    4 |     16.2 |     130 |  3/3  |  10/10 /0     |    9% |       0 | n-1 shards 8/8
    5 |      7.5 |     115 |  3/3  |  10/10 /0     |    8% |       0 | n-1 shards 8/8
--------------------------------------------------------------------------------------------
6 cycles   avg util 12%   HP met every cycle: YES   N-1 coverage 8/8 shards
[exit 0]

The header gives the case and the engine of the base solve, then the window per cycle, the worker count, the compute budget (workers x window, in core-seconds) and the job count. The columns are:

  • cycle: the cycle number.
  • base ms: the base solve, on one thread (76.6 ms in the first cycle of this capture against 7.5 to 22.0 ms later).
  • wall ms: the wall time of the fan-out.
  • HP: High jobs completed over High jobs scheduled.
  • LP done/adm/def: Low jobs completed, admitted this cycle, and deferred to a later one.
  • util%: the share of the compute budget spent.
  • backlog: the Low jobs still owed a run in the present rotation round.
  • note: n-1 shards K/N counts the shards completed at least once; HP MISSED marks a cycle where a High job did not complete.

case118 has 13 jobs: 3 High (watch list, hot N-1, harmonics) and 10 Low (8 N-1 shards, RoCoF, physics). With 7 workers and a 1,000 ms window the budget is 7,000 core-ms; no cycle spends more than 46% of it, so every Low job is admitted and every shard completes in the first cycle. --hold-steady keeps the operating point constant and warm-starts the base solve; without it the base solve follows the GB demand curve at one simulated minute per cycle.

Shrink the window and the budget and the scheduler shows its rotation:

gridsim cycle case118 --cycles 8 --hold-steady --window-ms 150 --workers 2
$ gridsim cycle case118 --cycles 8 --hold-steady --window-ms 150 --workers 2
GridSim  -  prioritised parallel analysis cycle: IEEE 118-bus
============================================================================================
case 118 buses / 186 branches   engine Newton-Raphson (dense)
window 150 ms   workers 2   budget 0.3 core-s/cycle   jobs 13 (3 High / 10 Low)
--------------------------------------------------------------------------------------------
cycle |  base ms | wall ms |  HP   | LP done/adm/def | util% | backlog | note
--------------------------------------------------------------------------------------------
    0 |     84.8 |     173 |  3/3  |   0/1  /9     |   54% |      10 | n-1 shards 0/8
    1 |     17.0 |      81 |  3/3  |   2/2  /8     |   49% |       8 | n-1 shards 2/8
    2 |     18.1 |      83 |  3/3  |   2/2  /8     |   52% |       8 | n-1 shards 4/8
    3 |     16.0 |      90 |  3/3  |   2/2  /8     |   53% |       8 | n-1 shards 6/8
    4 |     26.9 |      77 |  3/3  |   4/4  /6     |   45% |       6 | n-1 shards 8/8
    5 |      7.5 |     127 |  3/3  |   3/3  /7     |   78% |       7 | n-1 shards 8/8
    6 |      6.8 |      99 |  3/3  |   3/3  /7     |   50% |       7 | n-1 shards 8/8
    7 |      6.5 |     154 |  3/3  |   6/6  /4     |   88% |       4 | n-1 shards 8/8
--------------------------------------------------------------------------------------------
8 cycles   avg util 59%   HP met every cycle: YES   N-1 coverage 8/8 shards
[exit 0]

The budget is 2 workers x 150 ms = 300 core-ms. Each cycle admits as many Low jobs as fit and at least one. A shard cut off by the window keeps the outages it has screened and resumes from the next one in the following cycle, so the coverage count climbs (0, 0, 2, 2, 4, 4, 6, 6 shards) although five of the eight cycles complete no shard. High work is never cut off, so a cycle that overruns shows util% above 100 and still meets HP 3/3. The run exits 1 if any High job is ever missed. It exits 2 for an unknown case name, a positional case that disagrees with --dir, or --pipeline, and exits 1 for a missing or unloadable case file or folder.

Pitfalls

A positional case and --dir that name different networks are refused, because the verb cannot know which one was meant:

$ gridsim nminus1 case14 --dir data/uk
error: nminus1: a positional case 'case14' and --dir 'data/uk' were both given and name different networks. Give one of them.
[exit 2]
  • trip with one free token. gridsim trip case14 loads case14 and trips its largest eligible unit; case14 has no inertia data, so it exits 2 with found no eligible generator. gridsim trip Torness trips Torness on the default model. Write gridsim trip <case> <gen> to name both.
  • A missing --dir folder exits 1 with error: <verb>: case folder not found: '<folder>' (full path ...), before any report file is opened. A --dir with no value exits 2.
  • ISLANDED and NO SOLUTION are different findings. ISLANDED means the outage split the network; NO SOLUTION means a connected network with no solution. A solver error: row is a solver exception, not a verdict.
  • base only is not violation-free. A violation the base case already has is printed once and not counted against any outage, whether the outage leaves it as it was or makes it worse; read Vmin and Vmax on base only rows (the Irish model's TX15943 row takes the highest voltage from 1.126 to 1.173 pu). The verdict still fails, because the base case violates.
  • A non-zero exit is the verdict, not a crash. nminus1, nminus2, n-1-1, nminus1-sweep and screen exit 3 when anything is not secure. A script that only wants the table can ignore exit 3; one that gates on security reads it.
  • stress --from above --to is refused with exit 2, because the load range is empty.
  • The chain footer Warm start converges in <=1 iter with no drift - as expected. is absent on a case with reactive-limit switching (case118, case300), where every warm step takes 4 to 5 iterations. Its absence there does not mean a fault: check that the mismatch column does not drift.
  • Each report has its own metadata. nminus1-sweep, stress and chain write <report>.run-metadata.json next to their report, so reports sharing a folder keep their own; a re-run with the same --out replaces both.
  • screen and trip nadir and settling values are model output, not a forecast. The governor, damping and responsive-capacity constants are literature-typical values that have not been fitted to a measured trip. The initial RoCoF depends only on the inertia and the lost infeed.

Limits

  • A bare .m file name that matches two files in the data/matpower subfolders is refused with exit 2 and a list of the candidates; give the relative path. No two shipped files share a name today.
  • A violation present in the base case is netted by element: a pre-existing violation that an outage makes worse is not counted against that outage.
  • The screens do not elect a slack bus for an island that holds generation, so every split reads ISLANDED.
  • The N-1-1 corrective action works in the DC model (reactance only, 1 pu voltages): it holds rated lines and limited boundaries, not voltages, and minimises the MW moved, not the cost. The slack unit's room to move is measured from its DC-balanced output (its stated output plus its island's imbalance, which the slack absorbs), not from its stated output; the DC model is lossless, so AC losses are not in that figure.
  • nminus1 --outage-types gen,bus adds single generating units and busbar sections (a bus with everything on it); nminus2, n-1-1 and the sweep screen branches only, and there is no common-mode outage.
  • stress scales load and dispatch uniformly and treats a failed Newton-Raphson solve as collapse; it does not trace the nose of the PV curve.
  • screen and trip use the legacy 0.125 Hz/s RoCoF limit in their verdicts, and the governor, damping and responsive capacity constants behind the nadir are not fitted to a measured trip.
  • cycle --pipeline exits 2 because the pipelined backlog drain is not implemented (R096).

See also