This chapter specifies the time-domain electromagnetic transient engine: the Dommel nodal companion-model solver that steps the instantaneous network (L di/dt, C dv/dt) at a fixed microsecond timestep, the network builder that turns a GridModel into EMT elements, the gridsim emt driver, and the three-phase (abc) engine. The single-phase engine is EmtEngine (src/GridSim.Core/Dynamics/Emt/EmtEngine.cs); the builder is EmtNetwork.FromGridModel (src/GridSim.Core/Dynamics/Emt/EmtNetwork.cs); the three-phase engine is ThreePhaseEmtEngine (src/GridSim.Core/Dynamics/Emt/ThreePhaseEmt.cs).

EMT is the waveform-level counterpart of the other tools: the centre-of-inertia frequency model (ch. 5) works on one system frequency, the harmonic and impedance engines (ch. 19) work in phasors, and EMT resolves the waveform itself. An EMT run is a forward simulation about the model, not inference about the grid: it sits in Dynamics/ beside the other forward simulation tools, does not touch the estimator, and its output is a model trajectory. The design record is design/emt-time-domain.md; the task-level guide is ch. 16 of the user manual.

The engine is deterministic: the same network, step, rule and events give the same IEEE-754 bit pattern on every run on a given machine and runtime (Determinism and bit-identity states what is pinned). The conductance matrix is real, symmetric in value, constant between switching events, factored by sparse LU and back-substituted once per step (twice at a CDA event step). Every quantity is per-unit on the model's BaseMva; inductance and capacitance are per-unit values in seconds (L = X/w0, C = B/w0 for the total charging, which the build splits as (B/2)/w0 at each end) and the step dt is in seconds, so the products L/dt and C/dt are per-unit conductances. Fields and per-unit conventions are defined in ch. 2.

Model

Per-unit values

w0 = 2*pi*FrequencyHz, where FrequencyHz is the model's own system frequency (GridModel.FrequencyHz, default 50 Hz), never the --freq flag: --freq sets only the source waveform. EmtUnits (src/GridSim.Core/Dynamics/Emt/EmtUnits.cs) derives the element values:

series arm            R = br.R                      L = br.X / w0        (X >= 0)
series capacitor      R = br.R                      C = 1 / (|X| * w0)   (X <  0)
line charging, each end   C_end = (br.B / 2) / w0                         (B >  0)
negative charging, each end   L_end = 1 / ((|B| / 2) * w0)               (B <  0)
bus shunt             G = Gs / BaseMva   C = (Bs/BaseMva) / w0   (Bs > 0)
                                         L = 1 / (-(Bs/BaseMva) * w0)  (Bs < 0)
constant-impedance load   G = Pd / BaseMva
                          L = 1 / ((Qd/BaseMva) * w0)    (Qd > 0, inductive)
                          C = ((|Qd|)/BaseMva) / w0      (Qd < 0, capacitive)
Bergeron line         Zc = sqrt(X / B)              tau = sqrt(X * B) / w0

The reactance of a series capacitor at w0 is exactly X, and the susceptance of a charging or shunt element at w0 is exactly the data's value. A case whose buses carry BaseKv = 0 runs per-unit only; the engine reports per-unit voltages and currents and never converts to volts or amperes.

Elements

EmtElement (src/GridSim.Core/Dynamics/Emt/EmtElement.cs) is an immutable record addressed by integer node ids; EmtNetwork.Ground = -1 is the reference node, which never enters the solve.

Element Fields Meaning
SeriesBranch Id, From, To, R, L, Tap = 1 Series R-L arm; positive current is From to To. L = 0 is a pure resistor. Tap is an ideal Tap : 1 transformer on the From side.
SeriesCapacitorBranch Id, From, To, R, C, Tap = 1 Series R-C arm (series compensation) in one companion, no internal node.
ShuntElement Id, Bus, G = 0, C = 0, L = 0 Up to three parallel elements to ground; each non-zero part becomes its own branch.
VoltageSource Id, Bus, Rs, Emf(t) Rs > 0: Norton equivalent. Rs <= 0: ideal source, the bus becomes a Dirichlet node.
CurrentSource Id, Bus, Inj(t) Injects Inj(t) into the bus, returned from ground.
SwitchElement Id, From, To, Ron = 1e-6, Roff = 1e9, InitiallyClosed = true Conductance toggling between 1/Ron and 1/Roff; permanently in the matrix pattern.
BergeronLine Id, From, To, SurgeImpedance, TauSeconds Lossless distributed-parameter line.

Nodal equation

Unknowns are the voltages of the free nodes: every node except the Dirichlet nodes of ideal sources, which are eliminated. With n_free = NodeCount - (number of Dirichlet nodes) the system each step is

G * v_free = i_hist + i_src + i_dir

G       n_free x n_free, real, symmetric in value, built by stamping every branch and line
i_hist  history currents of the reactive branches, and the wave currents of the Bergeron lines
i_src   Norton and current-source injections at time t
i_dir   coupling of each branch to a Dirichlet node: g * v_dir (g * S * v_dir for a tapped arm)

A two-terminal branch carries i = Geq * v_branch + I_hist from K to M, with v_branch = v_K - v_M (or S*v_K - v_M behind a tap, below). Kirchhoff's current law at each free node moves the history term to the right-hand side with a minus sign for the K end and a plus sign for the M end.

Companion models

Every reactive branch is reduced to a conductance Geq and a history current by one linear form (Companion, src/GridSim.Core/Dynamics/Emt/Companion.cs):

i(n) = Geq * v(n) + I_hist(n)
I_hist(n) = HistCoeffV * v(n-1) + HistCoeffI * i(n-1)

v and i are the branch voltage and branch current of the previous step; Companion.History(vPrev, iPrev) evaluates the form. The factories are in EmtCompanionStamp. dt below is the step in seconds; in a critical-damping burst it is dt/2 (see "Switching events and CDA").

Resistor and switch (EmtCompanionStamp.Resistor; a switch is a resistor whose Gfixed the engine toggles):

Geq = 1/R          HistCoeffV = 0          HistCoeffI = 0

Series R-L (EmtCompanionStamp.SeriesRl; v = R i + L di/dt). L <= 0 returns the resistor exactly.

trapezoidal:    Geq = 1 / (R + 2L/dt)
                alpha = (2L/dt - R) / (2L/dt + R)
                I_hist = Geq * v_prev + alpha * i_prev
backward Euler: Geq = 1 / (R + L/dt)
                I_hist = i_prev / (1 + R*dt/L)                (HistCoeffV = 0)

Shunt inductor (EmtCompanionStamp.Inductor) is SeriesRl with R = 0: trapezoidal Geq = dt/(2L), I_hist = Geq*v_prev + i_prev; backward Euler Geq = dt/L, I_hist = i_prev.

Capacitor (EmtCompanionStamp.Capacitor; i = C dv/dt):

trapezoidal:    Geq = 2C/dt           I_hist = -Geq * v_prev - i_prev
backward Euler: Geq = C/dt            I_hist = -Geq * v_prev

Series R-C (EmtCompanionStamp.SeriesRc; v = R i + v_C, i = C dv_C/dt). With z the capacitor's companion resistance, z = dt/(2C) trapezoidal and z = dt/C backward Euler, the capacitor obeys v_C(n) = z i(n) + memory, and v_C(n-1) = v(n-1) - R i(n-1) gives

trapezoidal:    Geq = 1 / (R + dt/(2C))
                I_hist = -Geq * v_prev + Geq * (R - dt/(2C)) * i_prev
backward Euler: Geq = 1 / (R + dt/C)
                I_hist = -Geq * v_prev + Geq * R * i_prev

With R = 0 the series R-C rule equals the capacitor rule algebraically, and differs in the last bit, so a shunt capacitor keeps its own factory. A negative R (a network-reduction equivalent) is accepted; a resistance that cancels the companion resistance makes Geq infinite and the engine refuses it by name.

Off-nominal tap. A tapped series arm (Tap != 1) is an ideal Tap : 1 transformer on the From side followed by the arm. With S = 1/Tap the arm sees S * v_K - v_M, node K carries S * i, node M carries i:

arm voltage     v_arm = S * v_K - v_M
arm current     i = g * v_arm + I_hist                       (g = Geq of the arm's companion)
stamp           (K,K) += g * S^2     (M,M) += g     (K,M) = (M,K) += -g * S
right-hand side node K: -= S * I_hist      node M: += I_hist
Dirichlet M     rhs[K] += g * S * v_dir[M]       Dirichlet K     rhs[M] += g * S * v_dir[K]

At w0 this reproduces the power-flow stamp Yff = ys/a^2, Yft = Ytf = -ys/a, Ytt = ys for a real tap a = Tap. The From-end charging capacitor is C_end / a^2 so that Yff = (ys + jb/2)/a^2 holds as well. A branch current probe on a tapped arm reads the arm current i (the To-side current before the To-end charging); the From bus current is S * i. An untapped arm (Tap == 1, built by a == 1.0) takes the original stamping code path, which keeps untapped networks bit-identical to their pinned digests.

Sources.

ideal   (Rs <= 0):  bus is a Dirichlet node, v = Emf(t), eliminated from the unknowns
Norton  (Rs >  0):  conductance 1/Rs to ground (a resistor branch) and injection Emf(t)/Rs
current source:     injection Inj(t) at the bus
CLI source:         Emf(t) = amp * cos(2*pi*freq*t)  for freq > 0,   Emf(t) = amp  for freq = 0 (DC)

Bergeron line (BergeronLine; lossless distributed line). Yc = 1/Zc. N = max(1, round(tau/dt)) whole steps, fixed at construction. The line stamps Yc on the diagonal at each free end and nothing off the diagonal: the ends couple only through the delay buffers BufK and BufM (length N, read and written at slot Pos, Pos = (Pos + 1) mod N).

right-hand side      rhs[K] -= BufK[Pos]          rhs[M] -= BufM[Pos]
after the solve      i_km = Yc * v_k + BufK[Pos]  i_mk = Yc * v_m + BufM[Pos]
history write        BufK[Pos] = -Yc * v_m - i_mk
                     BufM[Pos] = -Yc * v_k - i_km
                     Pos = (Pos + 1) mod N
probe                i_km (current from K into the line) at the last step

A wave that leaves one end at step n is read at the other end at step n + N, so the modelled travel time is N * dt. A matched line absorbs the wave without reflection; an open end doubles it.

Building a network from a GridModel

EmtNetwork.FromGridModel(model, EmtBuildOptions) builds a single-phase network with one node per bus. The options are Sources (at least one, EmtSourceSpec(BusId, Rs = 0, AmplitudePu = 1, FrequencyHz = 0, PhaseDeg = 0)), IncludeLoads = true, UseTravellingWaveLines = false and NegativeDemand = ConstantCurrent. Element ids are assigned from 0 in build order: branches first (series arm, then its charging shunts), then loads, then bus shunts, then sources.

Every in-service branch is built so that it reproduces the power flow's branch stamp at w0 (EmtTapAndSeriesCapacitorTests checks it against AdmittanceStamp.Branch):

  • The tap a is TapRatio, and TapRatio <= 0 means 1.
  • Travelling-wave mode (UseTravellingWaveLines) applies to a branch that is not a transformer, has B > 0, X > 0 and a == 1. It becomes a BergeronLine(Zc, tau), lossless: the series R and the separate charging shunts are not built for it. Any other branch is built lumped, so a tap is never lost to the Bergeron model.
  • X < 0: SeriesCapacitorBranch(R, C = 1/(|X|*w0), a).
  • X >= 0: SeriesBranch(R, X/w0) when a == 1, else SeriesBranch(R, X/w0, a). X = 0 with R != 0 is a pure resistance arm.
  • B > 0: capacitors (B/2)/w0 at the To end and (B/2)/w0/a^2 at the From end. B < 0: shunt reactors L = 1/((|B|/2)*w0) at the To end and a^2 times that at the From end, so the susceptance at w0 is exactly -|B|/2 per end and no negative capacitance is ever built.
  • Loads (IncludeLoads): a bus with Pd == 0 and Qd == 0 gets none; otherwise a constant-impedance shunt G = Pd/BaseMva with an inductor for Qd > 0 or a capacitor for Qd < 0. A bus with Pd < 0 would make a negative conductance, which is not passive. NegativeDemand = ConstantCurrent (the default) builds instead a CurrentSource injecting |Pd|/BaseMva pu, shaped like the first source's EMF at unit amplitude (a constant for DC, cos(2*pi*f*t + phase) for AC), with the reactive demand still a passive L or C. NegativeDemand = Refuse throws an ArgumentException listing every bus with Pd < 0.
  • Bus shunts: G = Gs/BaseMva; Bs > 0 a capacitor, Bs < 0 a reactor.
  • Sources: EmtSourceSpec becomes a VoltageSource with the waveform above and phase PhaseDeg.
  • A model with BaseMva <= 0 gets no loads and no bus shunts.

The build refuses with an ArgumentException. The message names a branch as branch #index (from->to, 'name'), the buses for the negative-demand row and the bus for the source-bus row:

Condition Message states
no source in Sources an EMT build needs at least one source
in-service branch whose From or To bus is not in the model the branch is in service but the named end bus is not in the model; out-of-service branches are skipped without a check
PhaseShiftDeg != 0 a phase-shifting transformer cannot be represented by a real-valued single-phase network
R = 0 and X = 0 a zero-impedance coupler, an infinite conductance
NegativeDemand = Refuse and a bus with Pd < 0 lists each such bus with its Pd
source bus not in the model source bus N is not in the model

EmtNetwork.SeriesBranchIds lists (From, To, ElementId) of every series arm, Bergeron line included, so a caller can resolve a branch-current probe by its end buses. EmtNetwork.BusToNode maps bus id to node index.

Algorithm

Construction

new EmtEngine(network, dt, options) (EmtOptions.Rule = Trapezoidal, EmtOptions.UseCda = true by default):

  1. Refuse dt <= 0 or non-finite dt (ArgumentOutOfRangeException).
  2. Walk the elements in order and build the branch table. A SeriesBranch is refused (ArgumentException) for a non-finite R or L, for L < 0 (a capacitive arm must be a SeriesCapacitorBranch), for R = L = 0, and for a tap that is not a positive finite ratio. A SeriesCapacitorBranch is refused for a non-finite R or C, for C <= 0, and for a bad tap. A ShuntElement becomes one branch to ground per non-zero part (G resistor, C capacitor, L inductor). A SwitchElement becomes a resistor branch with Gfixed = 1/Ron when InitiallyClosed, else 1/Roff, and is registered in the switch map. A Norton source adds a resistor branch 1/Rs and an injector Emf/Rs; an ideal source adds a Dirichlet node; a CurrentSource adds an injector. A BergeronLine adds a line record with N = max(1, round(tau/dt)) and two zeroed delay buffers.
  3. Number the free nodes in node order, skipping Dirichlet nodes.
  4. Record the as-built switch conductances for Reset.
  5. Refactor() (the first factorisation), then InitializeRest().

A branch carries history when it is a shunt or series inductor (L > 0), a capacitor, or a series R-C arm; resistors, switches and pure-R arms do not.

Assembly, sparsity pattern, ordering and factorisation

Refactor() rebuilds G from scratch for the present dt and rule:

  1. Compute Companion for every branch with CompanionFor (resistor: Gfixed; the others by the factories above). A non-finite Geq throws InvalidOperationException naming the element id, its nodes and dt.
  2. Stamp into a CsrMatrix.Builder(n_free). An untapped branch adds g at (K,K) and (M,M) and -g at (K,M) and (M,K), each only where the node is free. A tapped branch adds g*S^2, g, -g*S, -g*S. A Bergeron line adds Yc at (K,K) and (M,M) only.
  3. Builder.Build() sorts each row by column with Array.Sort keyed on the column alone, sums the entries of a duplicated cell in insertion order (the row key is column then insertion index, so the order holds at every row length), drops added values equal to zero, and inserts an explicit diagonal entry in every row.
  4. The ordering is SparseLu.Ordering(G), reverse Cuthill-McKee on the structurally symmetrised graph: components start from a minimum-degree node, each node's unvisited neighbours are queued in ascending degree, and the visit order is reversed. It is a pure function of the sparsity pattern. The engine caches the ordering with the RowPtr and ColIdx arrays it was computed for and reuses it whenever a later Refactor() produces identical arrays (compared by content).
  5. SparseLu.FactorWithOrdering(G, ordering) converts to column form (exact zeros are dropped) and runs Gilbert-Peierls left-looking LU with partial pivoting: the column permutation is the RCM ordering, the row pivot of each column is the largest |x_i| over the rows that are still unpivoted. A pivot at or below NumericTolerances.RelativePivotFloor * max|G_ij| (1e-12 times the largest entry) returns null and the engine throws InvalidOperationException("EMT nodal matrix G is singular ..."). A non-finite companion conductance is refused before the factorisation, with InvalidOperationException.
  6. Size the per-step solve buffers and increment Refactorizations.

The sparsity pattern is the graph of the free nodes: one diagonal entry per free node, and one symmetric pair of off-diagonal entries for every pair of free nodes joined by a series arm, parallel arms merging into one cell. Shunts, sources, switches to ground and Bergeron lines add only diagonal entries. An open switch stays in the pattern as the conductance 1/Roff, which is never zero, so a switching event changes numbers and not the pattern.

Refactorisation happens in exactly these places, and nowhere else:

When Refactorisations
Construction 1
Reset() 1 (the ordering cache is kept; the pattern is unchanged)
A switching event that changed a conductance, CDA on and base rule trapezoidal 2 (to dt/2 backward Euler, back to dt trapezoidal)
A switching event that changed a conductance, any other configuration 1 (at the present dt and rule)
An event that changed nothing (closing a closed switch, opening an open one) 0
Several events due at one step counted once for the step

EmtRunStats.Refactorizations therefore equals 1 + 2 * (event steps with CDA) + (event steps without CDA). The step dt never changes within a run, so a refactorisation is never caused by anything but a switching event. The conductance matrices of the two CDA refactorisations are bit-identical to the trapezoidal G: for every reactive branch the backward-Euler value at dt/2 is the same correctly rounded quotient as the trapezoidal value at dt (l/(dt/2) = (2*l)/dt, c/(dt/2) = (2*c)/dt, (dt/2)/c = dt/(2*c), and halving dt is exact), so only the history coefficients differ between the rules.

Rest initial condition

InitializeRest() runs at construction and in Reset(). It seeds every reactive branch history so that a source already on at t = 0 gives the correct step response instead of the half-di/dt artefact of an all-zero history.

  1. Fixed nodes. Every Dirichlet node is fixed at Emf(0). Every node with a capacitor to ground is fixed at 0 V (an uncharged capacitor holds its node at 0 V at rest).
  2. Floating nodes. Union-find over the branches that conduct at rest, restricted to free-to-free pairs: a resistor or switch, a series arm with L <= 0 (a pure-R arm), and a series R-C arm with R != 0. A component is anchored when one of its nodes has a conducting branch to ground or to a fixed node. A switch that is open at construction (or after Reset()) neither joins nor anchors: its open conductance 1/Roff (1e-9 pu by default) stands in for "not connected". Were it counted, an island tied to ground only by an open fault switch would enter G_IC held by 1e-9 S while the same matrix carries 1e5 S elsewhere (pglib case240, fault on bus 8034: bus 8034 joins the network only through an inductive arm, and series capacitors with R = 1e-5 conduct as 1/R), past the sparse LU's pivot floor, which is relative to the largest entry. Such an island is pinned like any other floating part. An island anchored another way keeps the open switch's stamp in G_IC. Every node of an unanchored component is pinned at 0 V, and the number pinned is EmtEngine.InitialConditionFloatingNodes. Inductive arms are open at rest, so a bus joined to the network only through inductive arms, a transformer-only bus, is floating. Bergeron lines are not branches, so they do not anchor a node.
  3. Solve. Free nodes are numbered, G_IC is stamped from the branches that conduct at rest (tap-aware: g*S^2, g, -g*S) with g the companion conductance (for a series R-C arm, 1/R), the right-hand side collects the injectors evaluated at t = 0 and the coupling to fixed nodes, and SparseLu.Factor solves it. A singular G_IC throws InvalidOperationException("EMT initial-condition matrix is singular over n node(s) even after pinning m floating node(s) ...").
  4. Seed. For every branch with history, prevV is the branch voltage from the rest solution (S*v_K - v_M for a tapped arm) and prevI = 0. A series R-C arm at rest is an uncharged capacitor, a short, in series with R: with R != 0 it conducts as 1/R, is seeded with prevI = (1/R) * v_arm and prevV = R * prevI (so v_C = 0 exactly); with R = 0 it is open in the rest solve and seeded with prevI = 0, prevV = 0.
  5. Capacitor currents at t = 0+. A node held at 0 V by shunt capacitors still obeys Kirchhoff's current law: the injectors at that node (current sources, including the negative-demand current sources of FromGridModel, and Thevenin sources' Norton currents) evaluated at t = 0, plus the current of every branch that conducts at rest from a node at a non-zero rest voltage, can only flow into its capacitors. Each such capacitor is seeded with prevI = that inflow times C_k / sum C (parallel capacitors share by capacitance; one capacitor takes it all, exactly). A zero seed would make the trapezoidal rule take the injection as ramping up over the first step and integrate half a step of charge too little: a lasting offset of -I*dt/(2C) on the node. A node with zero inflow keeps the +0.0 seed, so a network with no injection or resistive current into a capacitor-held node is unaffected by this step. Backward Euler's capacitor history does not read prevI, so it is unaffected. Not covered: an injection at a pinned floating node (no conducting path at rest, so no defined destination) and an ideal series capacitor (open in the rest solve).

The rest solve does not write the node-voltage array that probes read. The t = 0 sample is the de-energised state just before the sources switch on (t = 0-): a probe reads 0 for every node voltage there, including an ideal source's own node, and 0 for every branch current except a conducting series R-C arm, which shows its seeded rest current. Sources and injections are on from t = 0+; their effect enters the trajectory through the seeded histories above and appears from the first stepped sample, which is the first solved voltage.

The time loop

EmtEngine.Simulate(EmtCase) returns the whole trajectory. EmtCase(Network, DtSeconds, DurationSeconds, Probes, Events) repeats the network and dt the engine was built with, and both are checked (next section).

Setup: steps = round(DurationSeconds / dt); eps = dt * EventTimeToleranceFraction; the events are sorted by time with a stable sort; every event is validated before any step; _advanced = true. The t = 0 point is recorded. Then for step = 1 .. steps, with t = step * dt (a product, never an accumulating sum):

  1. Apply every event whose AtSeconds <= t + eps, in sorted order. fired is true when at least one event changed a switch conductance.
  2. If fired and CDA is on and the base rule is trapezoidal: SetIntegration(dt/2, BackwardEuler); Step(t - dt/2, advanceLines: false); Step(t, advanceLines: true); SetIntegration(dt, base rule). Otherwise: if fired, Refactor(); then Step(t).
  3. Read every probe, update the running max |probe|, append the point.

Step(t, advanceLines):

  1. v_dir[node] = Emf(t) for every Dirichlet node.
  2. rhs = 0; add Inj(t) of every injector at a free node (a Norton source adds Emf(t)/Rs).
  3. For every Bergeron line subtract BufK[Pos] and BufM[Pos] from the end nodes' right-hand sides.
  4. For every branch: ih = History ? comp.History(prevV, prevI) : 0; store ih; stamp the right-hand side (untapped: rhs[K] -= ih, rhs[M] += ih, plus g * v_dir of a Dirichlet end; tapped: rhs[K] -= S*ih, rhs[M] += ih, plus g*S*v_dir).
  5. SolveInto(rhs, vFree, work): forward and back substitution on the stored L, U and permutations. Allocation-free, scalar IEEE-754 double arithmetic with no explicit fused multiply-add.
  6. Assemble the node voltages: free nodes from the solution, Dirichlet nodes from v_dir.
  7. For every branch: v_B = v_K - v_M (S*v_K - v_M tapped); prevV = v_B; prevI = Geq * v_B + ih.
  8. For every line: compute i_km, i_mk; record i_km as the line's probe current; when advanceLines is true, write the two history slots and advance Pos.

The loop runs under GcScope.LowLatency(). Probes: EmtProbeKind.NodeVoltage reads the node voltage; EmtProbeKind.BranchCurrent reads prevI of the branch whose ElementId equals the probe target (a shunt element with several parts answers with its first part: G, then C, then L), or the line's i_km, and NaN when the id names neither. EmtResult carries the probe names, the points (steps + 1, instants step * dt) and EmtRunStats(Steps, Refactorizations, MaxProbeAbs, WallMs). MaxProbeAbs covers the stepped samples and not the t = 0 sample. WallMs is wall-clock time of the loop and differs from run to run; it is not part of the numerical result. A NaN or infinite probe value, at t = 0 or at any step, throws InvalidOperationException ("non-finite value in trajectory (numerical failure)", naming the probe and the instant) at the first step it appears; no trajectory with a non-finite value is returned (the CLI maps it to exit 3).

Manual stepping (EmtEngine.Step(t)) advances the state and marks the engine advanced.

Switching events and CDA

SwitchEvent(AtSeconds, ElementId, Close) (src/GridSim.Core/Dynamics/Emt/EmtEvent.cs) closes a switch (Gfixed = 1/Ron) or opens it (1/Roff). EmtEvent is the abstract base; the engine applies only SwitchEvent.

Timing. An event is applied at the first step whose time satisfies t >= AtSeconds - eps, with eps = 1e-6 * dt (EmtConstants.EventTimeToleranceFraction). The tolerance absorbs the rounding of t = step * dt, so an event authored exactly on a step boundary is not deferred a step. An event between steps takes effect at the next step boundary with no interpolation: the new conductance acts over the whole interval (t - dt, t]. An event at or before t = 0 is applied at step 1. An event after the end of the run is never applied. Events at the same instant keep the order given.

Validation before the first step. Every event must be a SwitchEvent whose ElementId names a switch (ValidateEvents). Otherwise the engine throws ArgumentException listing each offending event and the valid switch ids, and the engine is left unadvanced. A series branch id given to switch:<id>@t:open is the standard mistake this catches.

No-op detection. ApplyEvent returns false when the requested conductance equals the present one (Gfixed == g), so re-closing a closed switch triggers neither a refactorisation nor a CDA burst, and the trajectory is bit-identical to the run without that event.

Critical Damping Adjustment. The trapezoidal rule is marginally stable: a discontinuity in a branch voltage or current excites a numerical oscillation at the Nyquist frequency (1/(2 dt)) that the rule does not damp, because its amplification factor on the stiff mode is -1. Backward Euler is L-stable, amplification factor 0, so it annihilates that mode. CDA runs the step that contains the discontinuity as two backward-Euler half-steps:

trigger   an event step with fired = true, UseCda = true and base rule = Trapezoidal
burst     SetIntegration(dt/2, BackwardEuler)     refactor (1)
          Step(t - dt/2, advanceLines: false)     sources at t - dt/2; line buffers read, not written
          Step(t,        advanceLines: true)      sources at t;        line buffers written, Pos advanced
          SetIntegration(dt, base rule)           refactor (2)

The burst covers exactly one dt, so the time axis is unchanged and every later step is a normal trapezoidal step from the state the burst left. The line history is frozen across the first half-step so a Bergeron line advances one buffer slot per full step regardless of the burst. With the base rule backward Euler, or with UseCda = false (--no-cda), the event step is a single ordinary step after one refactorisation. The worked example below measures the effect.

Case consistency, reset and refusals

The companions and the Bergeron delay counts are fixed at construction, so a case must describe the engine it is run on. Simulate checks, in this order, before any state moves:

  1. c.DtSeconds must equal the construction dt exactly: Double.Equals, so one ulp is a different step and NaN is refused. ArgumentException naming DtSeconds.
  2. c.Network must not be null (ArgumentNullException), must be the engine's own object, or must match it by value: the same node count, the same number of elements, and element by element Equals. A VoltageSource or CurrentSource contains a function, which cannot be compared, so for those the Id, Bus and (for a VoltageSource) Rs are compared and the engine's own function is the one that runs. ArgumentException naming the first difference.
  3. The engine must not have advanced: a second Simulate, or a Simulate after a manual Step, throws InvalidOperationException telling the caller to Reset() or build a new engine.
  4. The events are validated (previous section), and every event time must be finite, at or after 0 and at or before the last step's time (the loop's own tolerance); an event in [0, dt) applies at the first step (ValidateEventTimes).
  5. The duration must give at least one step: round(duration / dt) from 1 to int.MaxValue - 1 (StepCount); a duration of 0, a negative or non-finite one, or one below half a step is refused (ArgumentException naming DurationSeconds).
  6. Every probe must name something it can record (ValidateProbes): a node probe a node 0..NodeCount-1; a branch-current probe a series R-L or R-C arm, a switch, a Bergeron line or a shunt with exactly one part. A multi-part shunt (each part is its own stamped branch) and a source (its stamped branch is not the source current) are refused.

A refused case leaves the engine unadvanced, so the correct case still runs. Reset() restores every switch to its construction state, empties the Bergeron buffers, restores the construction dt and rule, clears every history and the right-hand-side and node-voltage buffers, zeroes Refactorizations, refactors and re-runs the rest solve; a run after Reset() is bit-identical to a fresh engine's. EmtEngine.Network and EmtEngine.DtSeconds expose what the engine was built with.

The refusals of the single-phase path:

Where Condition Exception
EmtNetwork constructor nodeCount <= 0 ArgumentOutOfRangeException
FromGridModel, EmtEngine constructor, Simulate null model, options, network or case ArgumentNullException
FromGridModel no source, dangling in-service branch, phase shifter, R = X = 0, refused negative demand, unknown source bus ArgumentException naming the branch or bus
EmtUnits.SeriesC reactance not negative ArgumentOutOfRangeException
EmtEngine constructor dt <= 0 or non-finite ArgumentOutOfRangeException
EmtEngine constructor (ValidateNetwork, before any stamping; every offender of a kind listed in one message) duplicate element ids; a node out of range (a one-terminal element on ground, or past the last node); two ideal voltage sources on one bus; a source Rs negative or not finite; a switch Ron or Roff not positive finite; a shunt C or L negative or non-finite, or a non-finite G; a Bergeron surge impedance or travel time not positive finite ArgumentException
EmtEngine constructor with EmtOptions.RefuseNonPassive any non-passive element: a series arm with negative R, a shunt with negative G (listed by default in EmtEngine.NonPassiveElements) EmtNonPassiveNetworkException (an ArgumentException)
EmtEngine constructor SeriesBranch: non-finite R or L; L < 0; R = L = 0; tap not positive finite ArgumentException naming the element
EmtEngine constructor SeriesCapacitorBranch: non-finite R or C; C <= 0; tap not positive finite ArgumentException naming the element
Refactor (construction, event, burst) a branch whose Geq is not finite (zero resistance, Ron = 0, Roff = 0, a resistance cancelling the companion resistance) InvalidOperationException naming element, nodes and dt
Refactor G singular (pivot at or below the relative floor) InvalidOperationException
Refactor a non-finite companion conductance in G InvalidOperationException
InitializeRest G_IC singular after pinning InvalidOperationException
Simulate DtSeconds differs from construction ArgumentException
Simulate network differs ArgumentException
Simulate engine already advanced InvalidOperationException
Simulate event not a SwitchEvent, or id not a switch ArgumentException listing valid switch ids
Simulate an event time outside the run; a duration with no step; a probe that names nothing ArgumentException

Three refusals as the verb prints them (captures refuse-non-switch-event.txt, refuse-phase-shifter.txt and refuse-bad-rule.txt in docs/_captures/emt/):

$ gridsim emt case14 --duration 0.01 --event switch:3@0.005:open
emt: EMT case has events that cannot act: switch event at 0.005 s names element 3, which is not a switch. Valid switch ids: none.
[exit 2]
$ gridsim emt cigre --duration 0.01
emt: EMT build: branch #12 (0->1) is a phase-shifting transformer (shift 30 deg). A phase shift multiplies the voltage phasor by a complex number, which a real-valued single-phase time-domain network cannot represent; it would be silently dropped. Remove the shift or use a phasor study. (Parameter 'model')
[exit 2]
$ gridsim emt case14 --rule foo
error: --rule expected trap or be but got 'foo'
[exit 2]

Passivity and singular systems

The engine has no modal or eigenvalue analysis. Stability is that of the discretisation: trapezoidal integration is A-stable and backward Euler is L-stable, so a passive network (non-negative G, C, L, R) gives a bounded trajectory. A network that contains a negative resistive or reactive element feeds energy into its natural modes and grows without bound; the builder therefore never creates one from negative charging or negative demand. Negative demand becomes a bounded current source (or is refused), and negative charging becomes a shunt reactor. A negative series resistance or shunt conductance that the case data itself carries (a network-reduction equivalent: IEEE 145 has 224 negative-resistance branches and 8 negative-conductance shunts, pglib case588 5 negative-resistance branches) is built as given and listed in EmtEngine.NonPassiveElements; EmtOptions.RefuseNonPassive refuses it by name, and the emt verb sets that option unless --allow-non-passive is given. The conductance matrix is real and symmetric in value, and a tapped arm stamps -g*S on both off-diagonals; the LU does not assume positive-definiteness, because partial pivoting handles the indefinite matrices that negative-R equivalents produce.

A defective or singular system fails loud rather than producing a result. A nodal matrix without a pivot above 1e-12 of its largest entry is singular and Refactor throws; every inductor and capacitor contributes a positive Geq, so a free node that is joined by any branch to ground or to a Dirichlet node does not make the matrix singular. The rest-solve matrix is guarded separately: nodes that have no conducting path at rest are pinned (counted, reported), and a matrix that is still singular throws.

Three-phase engine (programmatic API only)

ThreePhaseEmtEngine(ThreePhaseNetwork net, double dt, double frequencyHz = 50) is the abc generalisation of the scalar engine. It has no CLI verb and no builder from a GridModel: it is reached from code, and the tests listed under Invariants are its callers. It runs once (Simulate a second time throws InvalidOperationException).

ThreePhaseNetwork(BusCount, Sources, Branches, Shunts, Faults, Converters = null)
  ThreePhaseSource(Bus, AmplitudePu = 1, FreqHz = null)        phase p: Amplitude*cos(2*pi*f*t - p*120 deg); null f = the engine's
  ThreePhaseBranch(FromBus, ToBus, Rs, Ls, Rm = 0, Lm = 0)     symmetric self (Rs,Ls) and mutual (Rm,Lm)
  ThreePhaseShunt(Bus, G = 0, C = 0, L = 0)                    per phase, uncoupled
  ThreePhaseFault(Bus, Phases, Rf, AtSeconds, ClearSeconds)    shunt fault to ground on the listed phases
  ThreePhaseConverter(Bus, Unit, PllBandwidthHz = 20, FilterSusceptancePu = 0.05, StartupRampSeconds = 0.02)
engine.Simulate(duration, probeBus) -> (double[] T, double[][] Vabc)       one row per step, phases a, b, c
engine.ConverterTraces              -> per-converter EmtConverterTrace
engine.Refactorizations

Each bus is three nodes, 3*bus + p. A coupled branch stamps the 3x3 companion, so inter-phase mutual coupling is exact:

A = R + (2/dt) L            3x3, self on the diagonal, mutual off the diagonal
Y = inverse(A)              closed-form 3x3 inverse; |det| < 1e-300 throws InvalidOperationException
Alpha = Y * ((2/dt) L - R)
I_hist = Y * v_prev + Alpha * i_prev          (3-vectors)
i = I_hist + Y * v_branch                     stamped as Y, Y, -Y, -Y between the K and M phase nodes

Shunts use the same scalar companions as the single-phase engine, trapezoidal only. A fault is a conductance to ground, 1/Rf when AtSeconds - tol <= t < ClearSeconds - tol (tol = dt * EventTimeToleranceFraction) and EmtConstants.OpenFaultConductance (1e-9 pu) otherwise; it sits in the pattern throughout. Any change of any fault conductance triggers one Refactor(). The three-phase engine has no critical damping adjustment and no rest solve: every history starts at zero, and the ideal sources are Dirichlet nodes. The ordering cache and the solve buffers work as in the scalar engine.

Converters (ThreePhaseConverter) are average-value models. A grid-following converter is a balanced three-phase current source whose phasor comes from the same control law as the RMS engine (Models.RmsConverterState: K-factor reactive boost, current limit with reactive priority, LVACM, active-current freeze with ramp-limited recovery, blocking for a line-commutated terminal), so the two engines agree by construction (ch. 24). Per step:

  1. Injection: i_p = ramp * (Re(I) cos(a_p) - Im(I) sin(a_p)), a_p = w0 t - p * 120 deg, ramp = min(1, t / StartupRampSeconds), added to the right-hand side at the phase node (one-step explicit).
  2. After the solve, an SRF-PLL transforms the terminal voltage to the dq frame on its own angle (amplitude-invariant 2/3 Park transform) and advances PllInt += Ki*vq*dt, Theta += (w0 + Kp*vq + PllInt)*dt with Kp = 2*zeta*wn/V0, Ki = wn^2/V0, wn = 2*pi*PllBandwidthHz, zeta = 0.707 (ConverterDefaults.PllDampingRatio), V0 = max(|V0|, 1e-3).
  3. The fundamental magnitude is the Park magnitude low-pass filtered with VFilt += (|v_dq| - VFilt) * (1 - exp(-dt / 5 ms)) (ThreePhaseEmtEngine.MeasurementFilterSeconds). Dip logic and LVACM act on VFilt, never on the raw magnitude.
  4. The law is stepped and the current phasor is phased on the PLL angle, never on the instantaneous measured angle.

Each converter also carries a per-phase AC filter capacitor FilterSusceptancePu * RatingPu / w0 and the 20 ms soft start. A grid-forming unit (Unit.Parameters.GridForming) is an EMF behind its virtual reactance: a per-phase shunt inductor Lv = Xv / Rating / w0 plus the Norton current E * y; its power is measured from the actual terminal current (injection minus the inductor current) in the PLL frame and filtered at 5 ms; its current limit is armed at t >= 2 * StartupRampSeconds + 0.05 s on the filtered current and released when the unlimited current falls below 0.95 * Imax; while limited it injects the limited current plus the inductor's own last current.

The emt verb

gridsim emt drives the single-phase engine; the flags are in the CLI reference. The driver does the following, in order, and exits with the code shown on the first failure.

  1. Load the case. A load error exits 1. The default case is uk.
  2. Read --dt-us (default 20; must be positive, dt = dtUs * 1e-6 in binary floating point, which makes 20 us 1.9999999999999998e-05 s), --duration (0.1 s; must be above 0 and give at least one step), --amp (1), --freq (0, DC; below 0 is refused), --rule (trap or be; anything else is refused), --source (default: the first generator's bus, else the first bus). A bad numeric or enum flag exits 2 with error: --flag expected ... but got '...'.
  3. Build the network with an ideal source (Rs = 0) at the source bus, loads on unless --no-loads, Bergeron lines when --lines. A build refusal exits 2 with the message.
  4. Parse every --event. fault:<bus>@<t>:<Rpu> (Rpu a positive finite number; a bolted fault is a small one, for example 1e-4) adds one SwitchElement(id, node, Ground, Ron = Rpu, Roff = 1e9, InitiallyClosed = false) per distinct (bus, resistance), with ids from CliDefaults.EmtFaultSwitchIdBase = 1000000 in token order of first appearance, and a SwitchEvent(t, id, Close: true). A fault: at a bus opens that bus's other fault switches at the same instant, so a second fault: changes the fault's resistance; two faults at one bus at the same instant exit 2. clear:<bus>@<t> opens every fault switch of the bus and needs a fault: for that bus anywhere on the line. switch:<id>@<t>:close|open addresses an element id directly; FromGridModel builds no switch, so the ids that exist are the fault switches. The action word must be close or open (any letter case). Every event time must lie in the run. Every problem on the line is listed, then the run exits 2; a refusal starts error: emt:.
  5. Resolve the probes. v:<bus> and i:<from>-<to> (or i:<from>-><to>), comma separated; the default is the source-bus voltage and the first series branch current. A token that names no bus of the case, no in-service series branch in that direction, or is malformed exits 2 naming the token.
  6. Build the engine with EmtOptions { Rule, UseCda = !--no-cda, RefuseNonPassive = !--allow-non-passive } and Simulate. A non-passive network exits 2 naming its first 10 non-passive elements and suggesting --allow-non-passive; with the flag it runs and a warning gives the count. ArgumentException (an event naming a non-switch, a refused element) exits 2; InvalidOperationException (singular matrix, non-finite conductance, refused IC) exits 3.
  7. Report engine.InitialConditionFloatingNodes on stderr when it is above zero; the run continues.
  8. A non-finite probe value anywhere in the trajectory exits 3.
  9. Write <out>/timeseries.csv (provenance header lines starting #, then t_seconds,<probe names> and one row per point, values with 9 significant digits), <out>/summary.md and <out>/run-metadata.json, and print the one-line summary emt <case>: <steps> steps @ <dt>us, <n> factorization(s), peak |probe| <x>, <ms> ms -> <out>. <out> defaults to results/emt-out. summary.md reports the rule and CDA: on, CDA: off (--no-cda) or CDA: off (not used under backward Euler). run-metadata.json carries, after the shared sidecar, a parameters object: verb, case, modelName, dtMicroseconds, durationSeconds, steps, sourceBus, amplitudePu, frequencyHz, rule, criticalDampingAdjustment (what ran), noCdaFlag, travellingWaveLines, loads, allowNonPassive, nonPassiveElements (the count), probes (name, kind, target) and events (token, kind, bus or switch id, atSeconds, resistancePu, the switch ids, action).

Exit codes: 0 success, 1 case load failure, 2 usage or build error, 3 numerical failure.

Parameters and defaults

Name Value Unit Meaning Source symbol
Time step 20 us Fixed step; set once per engine --dt-us in Program.cs (FlagDouble(a, "--dt-us", 20.0))
Duration 0.1 s Simulated time --duration in Program.cs
Source amplitude 1.0 pu EMF amplitude --amp; EmtSourceSpec.AmplitudePu
Source frequency 0 Hz 0 is DC --freq; EmtSourceSpec.FrequencyHz
Source resistance 0 pu 0 makes an ideal (Dirichlet) source EmtSourceSpec.Rs
Integration rule trapezoidal - trap or be EmtOptions.Rule, IntegrationRule
CDA on - Backward-Euler half-steps at a changing event EmtOptions.UseCda
Loads on - Constant-impedance load shunts EmtBuildOptions.IncludeLoads
Travelling-wave lines off - Bergeron lines for charged non-transformer branches EmtBuildOptions.UseTravellingWaveLines
Negative demand ConstantCurrent - Bounded current source instead of a negative conductance EmtBuildOptions.NegativeDemand
Output directory results/emt-out - Result files --out
System frequency 50 Hz w0 = 2*pi*FrequencyHz for L, C GridModel.FrequencyHz
Event time tolerance 1e-6 fraction of dt Event applied when t >= At - 1e-6*dt EmtConstants.EventTimeToleranceFraction
Switch on resistance 1e-6 pu Closed switch EmtConstants.DefaultSwitchOnResistancePu, SwitchElement.Ron
Switch off resistance 1e9 pu Open switch (conductance 1e-9 pu) EmtConstants.DefaultSwitchOffResistancePu, SwitchElement.Roff
CLI fault switch off resistance 1e9 pu Open state of an --event fault switch CliDefaults.EmtSwitchOffResistance
CLI fault switch id base 1000000 - First element id of --event fault switches CliDefaults.EmtFaultSwitchIdBase
Open three-phase fault conductance 1e-9 pu ThreePhaseFault before and after EmtConstants.OpenFaultConductance
Pivot floor 1e-12 x max abs G Pivot at or below this is singular NumericTolerances.RelativePivotFloor
3x3 determinant floor 1e-300 - Singular three-phase branch matrix ThreePhaseEmtEngine.Inv3
Bergeron delay max(1, round(tau/dt)) steps Whole-step travel time EmtEngine constructor
PLL bandwidth 20 Hz EMT converter PLL natural frequency ConverterDefaults.EmtPllBandwidthHz
PLL damping 0.707 - PLL damping ratio ConverterDefaults.PllDampingRatio
Converter measurement filter 5 ms Fundamental-magnitude filter ThreePhaseEmtEngine.MeasurementFilterSeconds
Converter filter susceptance 0.05 pu of rating Per-phase AC filter capacitor ThreePhaseConverter.FilterSusceptancePu
Converter soft start 0.02 s Injection ramp from zero ThreePhaseConverter.StartupRampSeconds
Voltage floor for control 1e-3 pu Divisor floor in the PLL gain and grid-forming current readout EmtConstants.MinVoltageForControlPu
Limit arming 2 * ramp + 0.05 s Grid-forming limiter armed after this EmtConstants.LimitArmingRampMultiple, LimitArmingMarginSeconds
Limit release 0.95 x Imax Grid-forming limiter hysteresis EmtConstants.GfmLimitReleaseFraction
Zero-current threshold 1e-9 pu Unlimited current below this limits to zero EmtConstants.ZeroCurrentMagnitudePu
Three-phase source frequency the engine's Hz Default FreqHz is null, which means the engine's own frequency ThreePhaseSource.FreqHz

Ws13DynamicsConstantsAntiDriftTests.Emt_constants_equal_the_literals_they_replaced pins every EmtConstants value.

Invariants

Each invariant is pinned by a test in tests/GridSim.Tests/.

Invariant Test
The engine solves the electromagnetic equations: series RLC step response matches the closed form in all three damping regimes EmtRlcAnalyticTests.Series_rlc_step_response_matches_closed_form
Trapezoidal error is second order in dt EmtRlcAnalyticTests.Trapezoidal_error_is_second_order_in_dt
Two runs of the same network agree to 12 decimals EmtRlcAnalyticTests.Run_is_deterministic, EmtOutOfPhaseSyncTests.Run_is_deterministic
A DC-driven network settles to the resistive solution EmtSteadyStateTests.Rl_load_energised_dc_settles_to_the_resistive_solution
Closing onto an LC branch gives a recovery-voltage peak near twice the source; the matrix is refactored at the event EmtSwitchingTests.Closing_onto_an_lc_branch_gives_a_trv_peak_near_twice_the_source
CDA suppresses the Nyquist oscillation EmtSwitchingTests.Cda_suppresses_the_numerical_nyquist_oscillation
A matched Bergeron line absorbs the wave; an open end doubles it at tau; the sending end of an open-ended line reaches 1.0 by 2.5 ms with tau = 1 ms EmtLineTests.Matched_line_absorbs_the_wave_with_no_reflection, EmtLineTests.Open_ended_line_doubles_the_voltage_at_the_far_end
The series R-C companion reproduces the series RLC response (second order trapezoidal, first order backward Euler); with R = 0 it equals the capacitor rule EmtTapAndSeriesCapacitorTests.Series_rc_branch_reproduces_the_closed_form_series_rlc_step_response, Series_rc_trapezoidal_error_is_second_order_in_dt, Series_rc_backward_euler_converges_at_first_order, Series_rc_with_zero_resistance_is_algebraically_the_capacitor_rule
A tapped arm's DC steady state is the ideal-transformer solution EmtTapAndSeriesCapacitorTests.Tapped_branch_dc_steady_state_is_the_ideal_transformer_solution
The build maps tap, From-end charging and negative reactance exactly as the power-flow stamp; an untapped branch builds the original element; a tap is never lost to a Bergeron line Build_maps_tap_and_from_end_charging_exactly_as_the_power_flow_stamp, Build_maps_a_negative_reactance_to_a_series_capacitor_with_the_same_reactance, Untapped_branch_builds_exactly_the_original_element, Travelling_wave_mode_never_drops_a_tap (all EmtTapAndSeriesCapacitorTests)
Untapped cases give bit-identical trajectories: 13 pinned SHA-256 digests, each over every recorded instant of a 40 ms DC run at 20 us and the probes sampled for it (at most 150 evenly strided node voltages and the first 20 branch currents), as raw IEEE-754 bytes (gb-full, uk, case9 and case30, each lumped, with lines and with a fault; case33bw lumped) EmtUntappedBitIdentityTests.Untapped_case_emt_trajectory_is_bit_identical_to_the_pre_R078_engine
A case with a different dt (one ulp, NaN, double) or a different network is refused, and the refusal leaves the engine unadvanced EmtCaseConsistencyTests.A_case_with_a_different_dt_is_refused, A_case_with_a_different_network_is_refused, Refused_cases_leave_the_engine_unadvanced
An equivalent rebuilt network is accepted and gives bit-identical samples, statistics and max|probe| EmtCaseConsistencyTests.An_equivalent_rebuilt_network_is_accepted_and_gives_the_same_trajectory
A second Simulate, or one after a manual Step, is refused; Reset() then Simulate is bit-identical to a fresh engine (including an initially open switch) EmtCaseConsistencyTests.A_second_simulate_without_reset_is_refused, Simulate_after_a_manual_step_is_refused, Reset_then_simulate_is_bit_identical_to_a_fresh_engine, Reset_restores_an_initially_open_switch
The three-phase engine refuses a second Simulate EmtCaseConsistencyTests.Three_phase_engine_refuses_a_second_simulate
An event naming a non-switch is refused with the valid ids; a no-op event leaves the run bit-identical with no extra refactorisation; a real event refactors DistributionAndEmtInputValidationTests.A_switch_event_on_a_non_switch_element_fails_loud, A_no_op_switch_event_leaves_the_run_bit_identical_to_no_event, A_real_switch_event_still_fires_the_cda_and_refactors
The engine refuses duplicate ids, nodes off the network, two ideal sources on a bus, bad Rs, Ron, Roff, shunt and Bergeron parameters, listing every problem; it lists the non-passive elements (exactly those of IEEE 145 and pglib case588, none on the passive bundled cases) and refuses them on request; it refuses event times outside the run, a duration with no step and probes that name nothing Doc6EmtEngineTests (D024_*, D022_*, D019_*, D025_*)
The verb refuses bad event times, probes, durations, switch words and fault resistances (exit 2), refuses a non-passive case unless allowed, gives a second fault its own resistance, writes the parameters metadata and reports whether CDA ran Doc6EmtCliProcessTests (D019_* to D024_*, D121_*, D122_*, D123_*)
A pure-R arm conducts in the rest solve; a floating node is pinned without losing the rest of the IC; a fully anchored network reports 0; a singular IC matrix fails loud EmtInitialConditionTests.A_pure_resistance_series_arm_conducts_in_the_initial_condition, A_floating_node_is_pinned_and_the_rest_of_the_initial_condition_survives, A_network_with_every_node_anchored_reports_no_floating_nodes, A_singular_initial_condition_matrix_fails_loud_instead_of_being_skipped
The engine refuses what it cannot carry, naming it: L < 0, R = L = 0, bad tap, bad C, non-finite parameters, a companion that cancels EmtTapAndSeriesCapacitorTests (Engine_refuses_*, Engine_names_a_series_capacitor_whose_negative_resistance_cancels_its_companion)
The build refuses a phase shifter, a zero-impedance branch, a dangling in-service branch; an out-of-service dangling branch is skipped EmtTapAndSeriesCapacitorTests.Build_refuses_a_phase_shifter_naming_the_branch, Build_refuses_a_zero_impedance_branch_naming_it; EmtPassivityAndDanglingBranchTests.In_service_branch_to_a_missing_bus_is_refused_naming_the_branch, In_service_branch_from_a_missing_bus_is_refused_naming_the_from_bus, Out_of_service_branch_to_a_missing_bus_is_still_skipped
No build creates a negative G, C or L from negative charging or negative demand; Refuse lists every offending bus; IEEE 300 builds passive EmtPassivityAndDanglingBranchTests.Negative_line_charging_becomes_exact_shunt_reactors_never_a_negative_capacitor, Negative_demand_never_builds_a_negative_conductance, Refuse_mode_lists_every_negative_demand_bus_and_says_why, Bundled_ieee300_builds_a_passive_network_by_default
The EmtConstants values Ws13DynamicsConstantsAntiDriftTests.Emt_constants_equal_the_literals_they_replaced

Determinism and bit-identity

The single-phase engine is a deterministic sequential program. The element tables are built in element order and iterated in that order every step; the right-hand side is accumulated in a fixed order; the ordering (reverse Cuthill-McKee with comparer-driven sorts of deterministic keys) is a function of the pattern; the factorisation and SolveInto are scalar double-precision loops with no explicit fused multiply-add and no parallelism; t is step * dt so no rounding accumulates in the time axis. The guarantees that follow:

  • Same network, dt, rule, options and events: the same bits on every run on one machine and runtime, including after Reset() (EmtCaseConsistencyTests, which uses an AC source and compares two runs sample by sample in one process).
  • A rebuilt, element-equal network gives the same bits as the original (EmtCaseConsistencyTests).
  • A scheduled event that changes nothing leaves the trajectory bit-identical to the event-free run (DistributionAndEmtInputValidationTests).
  • The five cases gb-full, uk, case9, case30 and case33bw have pinned trajectories: the 13 digests of EmtUntappedBitIdentityTests fail on any change of the last bit of any recorded sample (the sampled node voltages and the first 20 branch currents, over 40 ms at 20 us). Other cases (case24, case118 and the rest) are not pinned. The digest runs use a DC source. An AC source evaluates DetMath.Cos (the deterministic fdlibm cosine, the same bits on every machine), but no AC trajectory is pinned by a digest yet: AC runs are checked for run-to-run identity (EmtCaseConsistencyTests) and against analytic oracles with tolerances.
  • The timing fields (WallMs, the printed milliseconds) are measurements and are not part of the result.

Validation results

Each oracle is independent of the engine. Tolerances are the test assertions.

Case Setup Result asserted
Series RLC step, underdamped, critical, overdamped V = 1 pu, L = C = 1e-3, R = 0.4, 2.0, 4.0, dt = 1 us, 3 ms max |i_emt - i_analytic| < 1e-5
Order of accuracy R = 0.4, 2 ms, dt = 2 us against 1 us error ratio > 3.0 (second order gives 4)
Series R-C loop (same three regimes) R and C in one SeriesCapacitorBranch, inductor to ground max error < 1e-5
Series R-C order dt = 2 us against 1 us trapezoidal ratio > 3.0; backward Euler ratio in (1.8, 2.2) and fine-step error < 1e-2
DC settle R = 1, L = 1e-3, Rload = 1, 20 time constants i = 0.5 and v1 = 0.5 to 6 decimals
Tapped arm at DC a = 1.1, R = 0.5, G = 2, 50 time constants i = (V/a)/(R + 1/G) and v1 = i/G to 12 decimals
Closing onto LC R = 0.01, L = C = 1e-3, dt = 2 us, close at 1 ms, 8 ms peak in [1.9, 2.02] pu; at least 3 refactorisations
CDA capacitor switched onto a voltage step, dt = 2 us peak second difference of the capacitor current with CDA < 0.5 x without
Matched line Rs = Zc = 100, tau = 1 ms, dt = 10 us far end below 0.02 before tau; 0.5 pu to 2 decimals at 2 ms and 2.9 ms; sending end 0.5 at 2 ms
Open-ended line same source far end below 0.05 before tau; 1.0 at 1.5 ms; sending end 0.5 at 0.5 ms and 1.0 at 2.5 ms (to 2 decimals)
Two-bus phasor, 8 parameter sets (tapped line with charging, tapped transformer, tapped and untapped series capacitors, negative-R equivalent, ideal series capacitor, tap 0) 50 Hz, dt = 10 us, 1 s, one-bin DFT of the last cycle |V2_emt - V2_phasor| < 2e-6 pu against AdmittanceStamp.Branch
Negative charging, 3 parameter sets same < 2e-6 pu
Power-flow equivalence, IEEE 14 and IEEE 57 slack and PV buses ideal sources at their power-flow voltages, PQ injections as admittances, dt = 10 us, 0.5 s worst bus |V_emt - V_pf| < 2e-5 pu; the test asserts the bound; its comment records the measured 5.44e-6 pu (case14) and 5.35e-6 pu (case57)
Negative demand at DC R = 0.1, Pd = -50 MW on 100 MVA V2 = 1.05 pu within 1e-12 at every stepped sample
Negative demand at 50 Hz R = 0.1, X = 0.2, Gs = 40 MW phasor error < 2e-6 pu
Out-of-phase synchronisation machine and inverter EMFs in opposition, breaker closes at a voltage zero, dt = 1 us, 60 ms max |i_emt - i_analytic| < 1e-5 pu after the close; first peak exceeds the AC magnitude
Three-phase balanced coupled line Rs = 1, Ls = 1 mH, Rm = 0.2, Lm = 0.3 mH, Rload = 10, dt = 20 us, t >= 0.08 s phase a against the positive-sequence phasor < 5e-3; |va + vb + vc| < 5e-3
Three-phase single-line-to-ground fault Rf = 0.01, 40 ms to 90 ms faulted phase rms < 0.25 x healthy phase B; phase C > 0.5 x pre-fault; phase a recovers to > 0.7 x; mean |va+vb+vc| > 0.05
Grid-following converter dt = 50 us, Rf = 0.05 fault 0.3 s to 0.45 s P = 0.5 to 2 decimals and |V| to 3 decimals at the phasor voltage; in the fault, V within 0.006 and Iq, Ip within 0.015 of an independent fixed point of the same law; recovers P = 0.5
Grid-forming converter fault 3.0 s to 3.15 s P = 0.5 at 2 decimals, |V| within 0.01; |I| = 1.2 pu to 2 decimals in the fault; recovers

Worked example

A bus fault on the IEEE 14-bus case, 50 Hz source at bus 1, branch current probed on 2-5. The fault closes at 10 ms through 0.01 pu and clears at 30 ms. The captures are in docs/_captures/emt/; timings in them are measurements and differ by machine and run.

$ gridsim emt case14 --duration 0.05 --dt-us 20 --freq 50 --probe v:5,i:2-5 --event fault:5@0.01:0.01 --event clear:5@0.03
emt case14: 2,500 steps @ 20us, 5 factorization(s), peak |probe| 3.146, 15 ms -> results\emt-out
emt: 2 floating node(s) pinned at 0 V in the initial-condition solve.
[exit 0]

What the numbers are:

  • 2,500 steps: round(0.05 / 20e-6). The matrix has 13 unknowns: 14 buses less the one Dirichlet node at bus 1.
  • 2 floating node(s): buses 7 and 8 have no load and no shunt, and their arms (4-7, 7-8, 7-9) are all inductive, so they are open at rest and the buses are pinned at 0 V. Every other bus has a load conductance or a capacitor to ground. The verb reports only the count; the bus numbers come from the case data.
  • 5 factorization(s): construction, plus two events times two refactorisations each. The fault at 0.01 applies at step 500 (t = 500 * dt is within 1e-6 * dt of 0.01); the clear at step 1500.
  • The fault switch has id 1000000, Ron = 0.01 pu (G = 100), Roff = 1e9 pu (G = 1e-9), a ratio of 1e11 between its two states, and it sits in the pattern at bus 5 from the first factorisation.

Companion values of branch 2-5 (R = 0.05695, X = 0.17388, B = 0.0346, no tap) at 50 Hz and dt = 20 us:

w0 = 314.159265359 rad/s       L = X/w0 = 5.53477230096e-4 s       C_end = (B/2)/w0 = 5.50676103098e-5 s
trapezoidal   2L/dt = 55.3477230096     Geq = 1/(R + 2L/dt) = 0.0180490190751     alpha = 0.997944216727
CDA half-step dt/2 = 10 us backward Euler   Geq = 1/(R + L/(dt/2)) = 0.0180490190751   I_hist = 0.998972108364 * i_prev
charging capacitor  trapezoidal Geq = 2*C_end/dt = 5.50676103098    I_hist = -Geq * v_prev - i_prev

The two conductances are the same number, as the refactorisation section states; the history coefficients are what the burst changes.

The samples around the two events, CDA on (rows copied from docs/_captures/emt/fault-bus5-case14-rows.txt):

$ rows of emt-out/timeseries.csv (CDA on)
t_seconds,v:5,i:2-5
0,0,0
0.00996,-0.89793361,-0.328595161
0.00998,-0.89879204,-0.329316458
0.01,-0.0150150838,-0.360231654
0.01002,0.00481759349,-0.393051468
0.01004,-0.0139926538,-0.425672898
0.01006,-0.00313357157,-0.457848392
0.01008,-0.0148277463,-0.489623585
...
0.02998,-0.0341363571,-1.12263369
0.03,-0.540118702,-1.12662265
0.03002,-1.03093107,-1.11727015
0.03004,-1.4906826,-1.09091199

Reading it:

  • The first row is the t = 0 sample: node voltages read 0 before the first step.
  • At 0.00998 s the bus-5 voltage is -0.8988 pu (the source is near its negative peak, cos(2*pi*50*0.01) = -1). At 0.01 s the fault has closed and the bus collapses to -0.0150 pu, while the branch current 2-5 rises smoothly (-0.3293, -0.3602, -0.3931, -0.4257): the inductors hold the current across the discontinuity, and the voltage is the only quantity that jumps.
  • At the clear (0.03 s) the voltage recovers through -0.5401, -1.0309, -1.4907 pu with no chatter.

The same run with --no-cda (docs/_captures/emt/fault-bus5-case14-no-cda.txt: 3 factorisation(s), one construction and one per event) shows what the burst removes:

$ rows of emt-out/timeseries.csv (--no-cda)
t_seconds,v:5,i:2-5
0,0,0
0.00996,-0.89793361,-0.328595161
0.00998,-0.89879204,-0.329316458
0.01,-0.107233042,-0.344319695
0.01002,0.0771907976,-0.376876996
0.01004,-0.067548886,-0.409976881
0.01006,0.0395528143,-0.442135543
0.01008,-0.0458202103,-0.47434145

Without CDA the bus voltage alternates sign every step, the Nyquist oscillation: the step-to-step swing between 0.01 s and 0.01002 s is 0.0771907976 - (-0.107233042) = 0.1844238396 pu. With CDA the same swing is 0.00481759349 - (-0.0150150838) = 0.0198326773 pu, 9.3 times smaller, and the first post-fault sample is -0.0150 pu instead of -0.1072 pu. CDA reduces the alternation and does not remove it: the successive swings with CDA are 0.0198, 0.0188, 0.0109 and 0.0117 pu over the next four steps, against 0.1844, 0.1447, 0.1071 and 0.0854 pu without it.

Source map

File Type Responsibility
src/GridSim.Core/Dynamics/Emt/EmtEngine.cs EmtEngine Branch table, assembly, refactorisation, rest solve, time loop, events, CDA, case checks, Reset
src/GridSim.Core/Dynamics/Emt/Companion.cs Companion, EmtCompanionStamp Companion conductance and history coefficients for R, R-L, L, C, series R-C
src/GridSim.Core/Dynamics/Emt/EmtElement.cs EmtElement and its records SeriesBranch, SeriesCapacitorBranch, ShuntElement, VoltageSource, CurrentSource, BergeronLine, SwitchElement
src/GridSim.Core/Dynamics/Emt/EmtNetwork.cs EmtNetwork, EmtBuildOptions, EmtSourceSpec, EmtNegativeDemand, EmtCase Network container, FromGridModel, build refusals, the case record
src/GridSim.Core/Dynamics/Emt/EmtEvent.cs EmtEvent, SwitchEvent Scheduled switch operations
src/GridSim.Core/Dynamics/Emt/EmtUnits.cs EmtUnits Per-unit L, C, Zc, tau, w0
src/GridSim.Core/Dynamics/Emt/EmtTypes.cs IntegrationRule, EmtProbe, EmtPoint, EmtRunStats, EmtResult, EmtOptions, EmtConstants Rule, probes, results, options, named constants
src/GridSim.Core/Dynamics/Emt/ThreePhaseEmt.cs ThreePhaseEmtEngine, ThreePhaseNetwork, ThreePhaseBranch, ThreePhaseFault, ThreePhaseConverter, EmtConverterTrace Three-phase engine and average-value converters
src/GridSim.Core/Numerics/Sparse.cs CsrMatrix.Builder Pattern assembly, duplicate summing
src/GridSim.Core/Numerics/SparseLu.cs SparseLu Reverse Cuthill-McKee ordering, FactorWithOrdering
src/GridSim.Core/Numerics/SparseLuFactorization.cs SparseLuFactorization Gilbert-Peierls LU, SolveInto
src/GridSim.Core/Numerics/NumericTolerances.cs NumericTolerances Relative pivot floor
src/GridSim.Cli/Program.cs RunEmt The emt verb
src/GridSim.Cli/CliDefaults.cs CliDefaults Fault switch resistance and id base
tests/GridSim.Tests/Emt*Tests.cs, ThreePhaseEmtTests.cs, DistributionAndEmtInputValidationTests.cs test classes The invariants and validation above

Limits

  • The t = 0 sample shows the de-energised t = 0- state, not the t = 0+ rest state; showing the rest state would move the trajectory digests pinned in EmtUntappedBitIdentityTests (N032, open for Mark).
  • The three-phase engine has no builder from a GridModel and no CLI verb; it is reachable from code only.
  • ThreePhaseSource.FreqHz defaults to 50 Hz regardless of the engine's frequencyHz (R138).
  • Phase-shifting transformers are refused: a real-valued single-phase network has no element for a complex ratio.
  • Bergeron lines are lossless and frequency-independent, and their delay is a whole number of steps, so the modelled travel time differs from tau by up to dt/2 once tau is at least dt/2; a line with tau below dt/2 is held at one step, an error of up to dt - tau.
  • The scalar engine has no converter or machine models; the CurrentSource is the seam they would use.
  • The t = 0 sample reads zero for every node voltage; the rest solution seeds the histories but not the node-voltage array.
  • A Bergeron line is outside the rest solve: its buffers start empty and it does not anchor a node.
  • A series capacitor with R = 0 is open in the rest solve, so an inductor in series with it starts from a zero-voltage seed.
  • A negative series resistance or shunt conductance from the case data is accepted by the engine (and by the verb with --allow-non-passive); such a network may grow without bound.
  • gridsim emt offers one ideal source, a DC or 0-phase sinusoid, NegativeDemand = ConstantCurrent, and no switch other than fault switches.
  • A second fault switch at a bus exists, open, from t = 0, so a two-fault run agrees with the one-fault run before the second fault to 1e-6 pu, not bit for bit.
  • The time step is fixed for the whole run; there is no adaptive stepping and no CDA for discontinuities other than switch events.